Wanlockhead railway station

Wanlockhead railway station was opened on 1 October 1902[2] as the terminus on the Leadhills and Wanlockhead Light Railway and served the lead mining area, farms and the village of Wanlockhead. Elvanfoot railway station in South Lanarkshire was the junction for the branch and was located on the west coast main line. It remained open until 2 January 1939 for passengers and freight.[2] When Wanlockhead station opened in 1902, a year after Leadhills station, it became the highest standard gauge adhesion station in the United Kingdom at 1,413 ft (431 m), 7 miles 24 chains (11.7 kilometres) from Elvanfoot.[6][7]

Wanlockhead
General information
LocationSouth Lanarkshire
Scotland
Grid referenceNS 87419 12607
Platforms1
Other information
StatusDisused
History
Pre-groupingCaledonian Railway
Post-groupingLondon Midland and Scottish Railway
Key dates
19 September 1902Open to freight[1]
1 October 1902Station opens to passengers[2]
31 December 1938[3]Last passenger train
2 January 1939Line officially closed to passengers and goods[4][5]
Leadhills and
Wanlockhead Branch
Elvanfoot
Leadhills
Wanlockhead

History

edit

Operated by the Caledonian Railway, it became part of the London, Midland and Scottish Railway during the Grouping of 1923. The line had been closed and lifted before the Scottish Region of British Railways came into existence upon nationalisation in 1948.[5] The line suffered greatly from the closure of the lead mines and passenger traffic was slight, although the station was located near to the small village of Wanlockhead.

To save money, the platform was only slightly raised at Wanlockhead. It was demarcated by a wooden fence. Carriages were fitted with three levels step board which folded down to enable passengers to alight and board at the station.

The station had a 100 yd (91 m) passing loop,[8] a single siding served a loading bank and a goods shed.[8] The waiting room, stationmaster's office, ticket office and men's toilet were located in a wooden lean-to building built along the long side of the goods shed.[9] No signals were present, however a telephone was provided.[9] The points were worked manually by the train crews as there wasn't a signal box. In 1916 a new siding was installed at the north side of the line.[10]

The line officially closed to all traffic on 2 January 1939. By April 1939, the track had been lifted and all buildings at the station demolished.[3]

Reuse

edit
 
Glengonnar Halt, terminus of the narrow gauge line.

The Leadhills and Wanlockhead Railway narrow gauge line and station are to be extended from Glengonnar Halt towards the site of the old station and its trackbed in the near future (datum 2019).[6]

Preceding station Historical railways Following station
Leadhills   Caledonian Railway
Leadhills and Wanlockhead Branch
  Terminus

References

edit

Notes

edit
  1. ^ Thomas, Page 50
  2. ^ a b c Butt 1995, p. 242.
  3. ^ a b Ireland, Page 54
  4. ^ Butt 1995, p. 140.
  5. ^ a b Wignal (1983), Page 67
  6. ^ a b Wham, Page 180
  7. ^ Ireland, Page 17
  8. ^ a b Ireland, Page 31
  9. ^ a b Ireland, Page 32
  10. ^ Ireland, Page 38

Sources

edit
  • Butt, R. V. J. (October 1995). The Directory of Railway Stations: details every public and private passenger station, halt, platform and stopping place, past and present (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN 978-1-85260-508-7. OCLC 60251199. OL 11956311M.
  • Ireland, Alastair (2011). The Leadhills and Wanlockhead Railway. Kelso : Alastair Ireland ISBN 0-9516271-1-2.
  • Thomas, J. (1971). Scotland: the lowlands and borders. A regional history of the railways V.6. Newton Abbot.
  • Wham, Alasdair (2017). Exploring Dumfries & Galloway's Lost Railway Heritage. A Walker's Guide. Catrine : Oakwood Press ISBN 9780853610830.
  • Wignall, C.J. (1983). Complete British Railways Maps and Gazetteer From 1830-1981. Oxford : Oxford Publishing Co. ISBN 0-86093-162-5.
edit
  • [1] Leadhills station on the Leadhills & Wanlockhead Railway.

55°23′40″N 3°46′44″W / 55.3944°N 3.7790°W / 55.3944; -3.7790