July 2011

edit

 Handling the shift independently as a shift In-charge  Planning and executing Preventive, Predictive, Repairs and shutdown maintenance.  Maintaining PLC, CNC, Micro processor based machine tools and equipments using ladder diagrams or other documentation.  Maintaining AC / DC Drives, with Thyristor / Transistor / IGBT / IPM based controls.  Maintaining In-process gauging and probing system in machines tools.  Maintaining Networking and SCADA across various machines and equipments.  Keeping maintenance costs under control by plugging wastage of energy and give regular feed back to management.  Ensuring availability and proper upkeep of technical documentation for effective problem solving.* Maintain optimum inventory and uptime of machines by proper Spares Planning, in-house/ external repairs, alternate part/ source development etc  To attend all Breakdown & Preventive maintenance.  Planning & execution of Preventive & Breakdown maintenance.  Planning & preparing of ISO documentation of internal & external audits.  Planning & execution of Preventive maintenance schedule, Spare parts maintaining.  Planning for proper inventory control.  Good knowledge of handling manpower & Team management.  Good knowledge of Erection and Commissioning of new project.  Good knowledge of different type of switchgears like Siemens, GE, L & T, Kubler, & ABB Standard.  Worked in “SAP” system as end user creating Notifications, PR, Orders and breakdown Reports & material maintaining.  Maintenance management and Material management by “SAP” system.

Parker Drilling Company

edit
 

This is an automated message from CorenSearchBot. I have performed a web search with the contents of Parker Drilling Company, and it appears to include material copied directly from http://www.linkedin.com/company/parker-drilling-company.

It is possible that the bot is confused and found similarity where none actually exists. If that is the case, you can remove the tag from the article. The article will be reviewed to determine if there are any copyright issues.

If substantial content is duplicated and it is not public domain or available under a compatible license, it will be deleted. For legal reasons, we cannot accept copyrighted text or images borrowed from other web sites or printed material. You may use such publications as a source of information, but not as a source of sentences. See our copyright policy for further details. (If you own the copyright to the previously published content and wish to donate it, see Wikipedia:Donating copyrighted materials for the procedure.) CorenSearchBot (talk) 09:32, 26 August 2014 (UTC)Reply

Speedy deletion nomination of Parker Drilling Company

edit
 

If this is the first article that you have created, you may want to read the guide to writing your first article.

You may want to consider using the Article Wizard to help you create articles.

A tag has been placed on Parker Drilling Company, requesting that it be deleted from Wikipedia. This has been done under two or more of the criteria for speedy deletion, by which articles can be deleted at any time, without discussion. If the page meets any of these strictly-defined criteria, then it may be soon be deleted by an administrator. The reasons it has been tagged are:

If you think this page should not be deleted for this reason, you may contest the nomination by visiting the page and clicking the button labelled "Click here to contest this speedy deletion". This will give you the opportunity to explain why you believe the page should not be deleted. However, be aware that once a page is tagged for speedy deletion, it may be removed without delay. Please do not remove the speedy deletion tag from the page yourself, but do not hesitate to add information in line with Wikipedia's policies and guidelines. - MrX 14:24, 26 August 2014 (UTC)Reply