Extended content
MBTA Boat
Route
F3/F4
Navy Yard
F3/F5
Lovejoy Wharf
(closed 2005)
Amtrak Orange Line (MBTA) Green Line (MBTA)
Lewis Street Wharf
(closed 1997)
East Boston Marine Terminal
(proposed)
F2
Long Wharf North
Blue Line (MBTA)
F4
Long Wharf Central
F2
Logan Airport
Logan International Airport Blue Line (MBTA) Silver Line (MBTA)#Waterfront: SL1 and SL2
F1
Rowes Wharf
F5
Fan Pier/Moakley Courthouse
(
closed 2005
proposed
)
Silver Line (MBTA)#Waterfront: SL1 and SL2
F5
World Trade Center
(closed 2005)
Silver Line (MBTA)#Waterfront: SL1 and SL2
F2
Georges Island
(seasonal)
F2/F2H
Pemberton Point, Hull
F2
Grape Island
(seasonal)
F2
Fore River Shipyard, Quincy
(closed 2013)
F1/F2
Hewitt's Cove, Hingham
Boston Harbor
 F0 
Route not in service

Summary of present connections

edit
Downeaster Fitchburg Line Lowell Line Haverhill Line Newburyport/Rockport Line
Acela Express Example Example Example Example Example
Northeast Regional Example Example Example Example Example
Lake Shore Limited Example Example Example Example Example
Framingham/Worcester Line Example Example Example Example Example
Needham Line Example Example Example Example Example
Franklin Line Example Example Example Example Example
Providence/Stoughton Line Example Example Example Example Example
Fairmount Line Example Example Example Example Example
Middleborough/Lakeville Line Example Example Example Example Example
Kingston/Plymouth Line Example Example Example Example Example
Greenbush Line Example Example Example Example Example
North Station
MBTA Commuter Rail and Amtrak Downeaster trains at North Station
General information
Location126 Causeway Street
Boston, MA 02114
Coordinates42°21′57″N 71°03′40″W / 42.3657°N 71.061°W / 42.3657; -71.061
Owned byMassachusetts Bay Transportation Authority
Platforms6 island platforms (Commuter Rail and Amtrak; only 5 active)
2 side platforms and 1 island platform (Orange Line and Green Line)
Tracks12 (Commuter Rail and Amtrak; only 10 active)
2 (Orange Line)
2 (Green Line)
ConnectionsBus transport MBTA Bus: 4
Bus transport CRTMA: EZRide
Construction
Parking1275 spaces (privately owned garage)
38 accessible spaces
Bicycle facilities20 spaces
Hubway dock
AccessibleYes
Other information
Station codeBON (Amtrak)
Fare zone1A (MBTA Commuter Rail)
History
OpenedSeptember 3, 1898 (Green Line surface)
June 19, 1901 (Orange Line elevated)
June 1, 1912 (Green Line elevated)
1928 (commuter and intercity rail)
April 7, 1975 (Orange Line subway)
June 28, 2004 (Green Line subway)[1]
ClosedApril 4, 1975 (Orange Line elevated)
March 28, 1997 (Green Line surface)
June 25, 2004 (Green Line elevated)[1]
Rebuilt1995, January 2007 (commuter rail)
Passengers
201317,079 daily boardings[2] (MBTA subway)
201216,436 daily boardings[3] (MBTA Commuter Rail)
2015358,286 annual boardings and alightings[4]Decrease 17.3% (Amtrak)
Services
Preceding station Amtrak Following station
Terminus Downeaster Woburn
toward Brunswick
Preceding station MBTA Following station
Porter
toward Wachusett
Fitchburg Line Terminus
Terminus Lowell Line West Medford
Haverhill Line
Limited service
West Medford
toward Haverhill
Haverhill Line Malden Center
toward Haverhill
Newburyport/​Rockport Line Chelsea
Haymarket Green Line Terminus
Haymarket Green Line Science Park
Haymarket Orange Line Community College
toward Oak Grove
Former / future services
Preceding station MBTA Following station
Starting 2021
Haymarket
toward Riverside
Green Line Science Park
Haymarket Green Line Science Park
Former services
Cambridge Central Mass Branch
Closed 1971
Terminus
Cambridge
toward Bedford
Lexington Branch
Closed 1977
Terminus Lowell Line
Closed 1981
West Medford
Preceding station Boston Elevated Railway Following station
Battery Street Atlantic Avenue Elevated
Closed 1938
Terminus









Dist.
Station
0 mi
New York Penn Station
NJ Transit
10 mi
16 km
Newark
NJ Transit Port Authority Trans-Hudson
58 mi
93 km
Trenton
NJ Transit
85 mi
137 km
North Philadelphia
111 mi
179 km
Paoli
159 mi
256 km
Lancaster
194 mi
312 km
Harrisburg
325 mi
523 km
Altoona
362 mi
583 km
Johnstown
439 mi
707 km
Pittsburgh Penn Station
541 mi
871 km
Canton
628 mi
1011 km
Crestline
700 mi
1127 km
Lima
759 mi
1221 km
Fort Wayne
Valparaiso
882 mi
1419 km
Gary
907 mi
1460 km
Chicago Union Station
Metra


  1. ^ a b Cite error: The named reference netransit was invoked but never defined (see the help page).
  2. ^ "Ridership and Service Statistics" (PDF) (14 ed.). Massachusetts Bay Transportation Authority. 2014. Retrieved 18 August 2014.
  3. ^ Humphrey, Thomas J. (21 December 2012). "MBTA Commuter Rail Passenger Count Results" (PDF). Boston Region Metropolitan Planning Organization. Retrieved 10 August 2015.
  4. ^ "Amtrak Fact Sheet, FY2015, Commonwealth of Massachusetts" (PDF). Amtrak. November 2015. Retrieved May 1, 2016.


🏳️‍⚧️

‮This is a text.