Melbourne Airport Railway line

edit
Melbourne Airport
 
Overview
Service typeCommuter rail
SystemMelbourne railway network
StatusUnder Construction
First service2029 (proposed)
Current operator(s)Metro Trains (proposed)
Route
Termini{ubl|Pakenham|Cranbourne}
Melbourne Airport
Line(s) used
Technical
Rolling stockHCMT (proposed)

History

edit

Planning

edit

Construction

edit

Network and Operations

edit

Planned Route

edit

Planned Stations

edit

Legend

*-The following station is not open yet and thus not all information will be accurate by the time it opens

Station Accessibility Opened Terrain Train connections Planned connections Notes
Anzac* Yes—step free access 2025[1] Underground
3 connections
  Opening as part of the Metro tunnel project in 2025[1]
Town Hall*        
State Library*      
Parkville*  
Arden*
Footscray No—steep ramp 1859 Ground    
Middle Footscray No—steep ramp 1906
1 connection
 
West Footscray Yes—step free access 1888
Tottenham No—steep ramp 1891
Sunshine Yes—step free access 1885
1 connection
 
Keilor East* 2029 Opening in 2029 alongside the airport line's opening
Melbourne Airport* Elevated  

Infrastructure

edit

Planned Rollingstock

edit
  1. ^ a b Victoria's Big Build (28 November 2022). "About the Metro Tunnel Project". Victoria’s Big Build. Retrieved 9 December 2022.