Melbourne Airport Railway line
editMelbourne Airport | |
---|---|
Overview | |
Service type | Commuter rail |
System | Melbourne railway network |
Status | Under Construction |
First service | 2029 (proposed) |
Current operator(s) | Metro Trains (proposed) |
Route | |
Termini | {ubl|Pakenham|Cranbourne} Melbourne Airport |
Line(s) used |
|
Technical | |
Rolling stock | HCMT (proposed) |
This section is empty. You can help by adding to it. (February 2023) |
History
editPlanning
editThis section is empty. You can help by adding to it. (February 2023) |
Construction
editThis section is empty. You can help by adding to it. (February 2023) |
Network and Operations
editPlanned Route
editThis section is empty. You can help by adding to it. (February 2023) |
Planned Stations
editLegend
*-The following station is not open yet and thus not all information will be accurate by the time it opens
Station | Accessibility | Opened | Terrain | Train connections | Planned connections | Notes | |
---|---|---|---|---|---|---|---|
Anzac* | Yes—step free access | 2025[1] | Underground | 3 connections |
Opening as part of the Metro tunnel project in 2025[1] | ||
Town Hall* | |||||||
State Library* | |||||||
Parkville* | |||||||
Arden* | |||||||
Footscray | No—steep ramp | 1859 | Ground | ||||
Middle Footscray | No—steep ramp | 1906 | 1 connection |
||||
West Footscray | Yes—step free access | 1888 | |||||
Tottenham | No—steep ramp | 1891 | |||||
Sunshine | Yes—step free access | 1885 | 1 connection |
||||
Keilor East* | 2029 | Opening in 2029 alongside the airport line's opening | |||||
Melbourne Airport* | Elevated |
Infrastructure
editPlanned Rollingstock
editThis section is empty. You can help by adding to it. (February 2023) |
- ^ a b Victoria's Big Build (28 November 2022). "About the Metro Tunnel Project". Victoria’s Big Build. Retrieved 9 December 2022.