•••••••• DEMO ONE ••••••••

edit

The following demonstrate a problem when page is viewed on Firefox. Another investigator reports that this shows also in Internet Explorer.

For Opera, Chrome, and Safari, both gallery displays will be identical.

For Firefox, IE, and perhaps others, the first gallery will be page left, rather than centered - the second gallery should be centered in all browsers.


Beginning of demonstration -----

Following WITHOUT Firefox hack

edit

Following WITH Firefox hack

edit



End of demonstration 1 -----

•••••••• DEMO TWO ••••••••

edit

Problem

edit

Note that the following image does not work as a centered gallery, this since we want the text left justified. Putting an uncentering before the text results in page-left justification rather than image-left, this is likely a deficiency in the html generation.

(This is gallery with external centering)

Several construction phases can be seen in this early 2011 image, from finished columns to falsework erection through formwork completion prior to concrete pouring.


Left: Temporary double deck S-Curve (upper deck is westbound toward tunnel).
Center: Southern columns (for eastbound traffic from tunnel lower deck).
Right: Northern columns, falsework, and formwork (westbound to tunnel upper deck).

  • Several construction phases can be seen in this early 2011 image, from finished columns to falsework erection through formwork completion prior to concrete pouring.


    Left: Temporary double deck S-Curve (upper deck is westbound toward tunnel).
    Center: Southern columns (for eastbound traffic from tunnel lower deck).
    Right: Northern columns, falsework, and formwork (westbound to tunnel upper deck).

    Work Around One (Display as thumb)

    edit
     
    Several construction phases can be seen in this early 2011 image, from finished columns to falsework erection through formwork completion prior to concrete pouring.
    Left: Temporary double deck S-Curve (upper deck is westbound toward tunnel).
    Center: Southern columns (for eastbound traffic from tunnel lower deck).
    Right: Northern columns, falsework, and formwork (westbound to tunnel upper deck).

    Work Around Two (Display as wide image)

    edit
    Several construction phases can be seen in this early 2011 image, from finished columns to falsework erection through formwork completion prior to concrete pouring.
    Left: Temporary double deck S-Curve (upper deck is westbound toward tunnel).
    Center: Southern columns (for eastbound traffic from tunnel lower deck).
    Right: Northern columns, falsework, and formwork (westbound to tunnel upper deck).