Interstate 265 in Kentucky
editI-265 in the US state of Kentucky presently runs 28.7 miles (46.2 km) from the Lewis and Clark Bridge in northern Louisville to an interchange with I-65 in southern Louisville.[1] The entire freeway is concurrent with KY 841.
The Gene Snyder Freeway, in which KY 841 and I-265 overlap for 24.477 miles (39.392 km) between I-65 and the Indiana state line, has seen an increase in serious accidents. The primary factors stem from its low-level grass median which offers little to no protection for crossover incidents. Driver inattention and increased traffic and congestion has led to a decline in the overall level-of-service. In 2006, cable barriers were installed in the median for 10 miles (16 km) between I-71 and I-64, with further installation possible in the near future.[2] Part of the road is currently signed in kilometers, which is unusual in the United States.[3]
Route information | ||||
---|---|---|---|---|
Auxiliary route of I-65 | ||||
Maintained by KYTC | ||||
Length | 28 mi (45 km) | |||
Existed | 1987–present | |||
History | Built in 1987 including the Future section | |||
NHS | Entire route | |||
Restrictions | No hazardous goods allowed on the Lewis and Clark Bridge and East End Tunnel | |||
Major junctions | ||||
Beltway around Louisville | ||||
West end | Future I-265 begins / I-65 In Louisville, KY | |||
US 31E / US 150 in Louisville
I-64 in Middletown US 60 in Middletown | ||||
North end | I-265 at Indiana State Line | |||
Location | ||||
Country | United States | |||
State | Kentucky | |||
Highway system | ||||
| ||||
|
Future
editI-265 Widening
editKYTC planned to widen I-265 to 6 lanes from KY 155 (Taylorsville Road) to I-71 (Riverside Expressway), The construction is started in 2020 and will be completed in Spring 2024.[4]
I-64/I-265 Interchange
editThe I-265/I-64 interchange, currently a cloverleaf with no collector–distributor lanes,[5] is being reconstructed as part of the I-Move Kentucky Project with an estimated completion in the autumn of 2023.[6]
I-71/I-265 Interchange
editIn 2021, the interchange has been reconstructed with one collector–distributor lanes.
Extension To Corydon, IN Or Exits 119-121
editThis section is empty. You can help by adding to it. |
Exit List
editThis section is missing mileposts for junctions. |
The entire route is in Jefferson County.
Location | mi | km | Old exit | New exit | Destinations | Notes | ||
---|---|---|---|---|---|---|---|---|
Ohio River | I-265 north (Lee H. Hamilton Freeway) | Future countinuation to Harrison County, Indiana | ||||||
West End Bridge (Proposed Toll Bridge) | ||||||||
Louisville | 0.0 | 0.0 | - | 1 | US 31W / US 60 – Fort Knox, Louisville KY 1934 | KY 841 will be resigned as I-265 in the future | ||
3.1 | 5.0 | - | 3 | Stonestreet Road | ||||
6.0 | 9.7 | - | 6 | KY 1865 (New Cut Road) | ||||
7.7 | 12.4 | - | 8 | KY 1020 (National Turnpike) – Fairdale | ||||
10.2 | 16.4 | 10 | 0 | I-65 to I-264 – Nashville, Louisville | I-65 exit 125; signed as exits 10A (north) and 10B (south) westbound Continues as KY 841 past this exit | |||
11.7 | 18.8 | 12 | 1 | KY 61 (Preston Highway) To Cooper Chapel Road east | Future northern terminus of the KY 61 freeway section | |||
- | 2 | Cinderella Lane | Proposed interchange | |||||
13.5 | 21.7 | 14 | 3 | Smyrna Road To KY 1065 | Named as Smyrna Parkway | |||
15.2 | 24.5 | 15 | 4 | KY 864 (Beulah Church Road) to KY 2845 west | ||||
15.0 | 24.1 | - | 4B | Pennsylvania Run Road | Westbound exit only (Proposed) | |||
- | 5 | Johnson School Road | Proposed | |||||
17.3 | 27.8 | 17 | 6 | US 31E / US 150 – Bardstown, Louisville | ||||
- | 7 | Seatonville Road | Proposed | |||||
19.4 | 31.2 | 19 | 8 | KY 1819 (Billtown Road) | ||||
23.1 | 37.2 | 23 | 12 | KY 155 – Jeffersontown, Taylorsville | Southern terminus of the 6-lane portion | |||
- | 13 | Rehl Road | Proposed interchange[7] | |||||
Middletown | 25.5 | 41.0 | 25 | 14 | I-64 – Lexington, Louisville | I-64 exit 19; signed as exits 25A (east) & 25B (west). | ||
26.8 | 43.1 | 27 | 16 | US 60 (Shelbyville Road) – Middletown, Eastwood | ||||
Middletown–Louisville city line | - | 17 | Aiken Road | Proposed | ||||
Louisville | 28.7 | 46.2 | 29 | 18 | Old Henry Road | |||
30.4 | 48.9 | 30 | 19 | KY 146 (La Grange Road) – Anchorage, Pewee Valley | ||||
32.5 | 52.3 | 32 | 21 | KY 1447 (Westport Road) / Chamberlain Lane | ||||
34.0 | 54.7 | 34 | 23 | KY 22 (Brownsboro Road) to KY 1747 south – Crestwood | ||||
34.7 | 55.8 | 35 | 24 | I-71 to I-264 west – Cincinnati, Louisville | I-71 exit 9; signed as exits 35A (east) & 35B (west) Former northern terminus of I-265 Northern terminus of the 6-lane portion | |||
Prospect | 37.0 | 59.5 | 37 | 26 | US 42 – Prospect | Northbound exit and southbound entrance only | ||
Louisville East End Tunnel | ||||||||
Ohio River | 38.9 13.11 | 62.6 21.10 | Lewis and Clark Bridge (East End Bridge) (Opened December 18, 2016); at state line | |||||
I-265 west (Lee H. Hamilton Freeway) | Countinuation to Clark County, Indiana Northwestern terminus of KY 841 | |||||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Old exit list
editThe entire route is in Jefferson County.
Location | mi | km | Exit | Destinations | Notes |
---|---|---|---|---|---|
Louisville | 10.2 | 16.4 | 10 | I-65 – Nashville, Louisville | I-65 exit 125; signed as exits 10A (north) and 10B (south) westbound Continues as KY 841 past this exit |
11.7 | 18.8 | 12 | KY 61 (Preston Highway) | ||
13.5 | 21.7 | 14 | Smyrna Road | ||
15.2 | 24.5 | 15 | KY 864 (Beulah Church Road) | ||
17.3 | 27.8 | 17 | US 31E / US 150 – Bardstown, Louisville | ||
19.4 | 31.2 | 19 | KY 1819 (Billtown Road) | ||
23.1 | 37.2 | 23 | KY 155 – Jeffersontown, Taylorsville | ||
Middletown | 25.5 | 41.0 | 25 | I-64 – Lexington, Louisville | I-64 exit 19; signed as exits 25A (east) & 25B (west). |
26.8 | 43.1 | 27 | US 60 (Shelbyville Road) – Middletown, Eastwood | ||
Louisville | 28.7 | 46.2 | 29 | Old Henry Road | |
30.4 | 48.9 | 30 | KY 146 (La Grange Road) – Anchorage, Pewee Valley | ||
32.5 | 52.3 | 32 | KY 1447 (Westport Road) / Chamberlain Lane | ||
34.0 | 54.7 | 34 | KY 22 (Brownsboro Road) – Crestwood | ||
34.7 | 55.8 | 35 | I-71 – Cincinnati, Louisville | I-71 exit 9; signed as exits 35A (east) & 35B (west) | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
References
edit- ^ "INDOT Reference Post Book - July 2015" (PDF). Indiana Department of Transportation. Retrieved December 25, 2016.
- ^ Hogan, Doug (January 20, 2006). "Governor Fletcher & Kentucky Transportation Cabinet Move Forward with Safety Measures for Interstate Highways: Median Cable Barriers to Be Installed at Two Jefferson County Locations" (Press release). Kentucky Transportation Cabinet. Archived from the original on September 27, 2006.
- ^ Stevens, Ashlie (14 June 2019). "Curious Louisville: Why Is A Stretch Of Louisville Highway Measured In Kilometers?". 89.3 WFPL News Louisville.
- ^ "Interstate 265 Widening Project | KYTC". transportation.ky.gov. Retrieved 2023-09-30.
- ^ "Interstate 64 at Interstate 265 Interchange Reconstruction | KYTC". transportation.ky.gov. Retrieved 2022-03-23.
- ^ "About – I-Move Kentucky". i-moveky.com. Retrieved 2022-03-23.
- ^ "Rehl Road Interchange" (PDF). transportation.ky.gov. Kentucky Transportation Cabinet. Retrieved October 4, 2023.