Floating Liquefied Natural Gas (FLNG) is an innovative technology designed to enable the development of offshore gas resources that would otherwise remain untapped, because it’s unviable to develop them via a land-based LNG operation due to environmental or economic factors. The first FLNG facility is now in development by Shell.[1] Floating above an offshore gas field, the FLNG facility will produce, liquefy, store and transfer LNG (and potentially LPG and condensate) at sea before carriers ship it directly to markets around the world. FLNG is complementary to on-shore LNG projects.

Contents

  1. Background
  2. Current Projects
  3. Challenges
  4. Advantages
  5. Operation
  6. Specifications
  7. Construction
  8. Safety
  9. External References


1. Background

Studies into offshore LNG production have been underway since the early 1970s, but it was only in the mid 1990s that significant research backed with experimental development began.[2]

In 1997 Mobil developed a floating LNG production concept based on a large, square structure with a moon-pool, commonly known as ‘the doughnut’.[3] In 1999 a major study was commissioned as a joint project by Chevron and several other oil and gas companies.[4] This was closely followed by the so-called “Azure” research project by the EU and several oil and gas companies.[5] Both projects made great progress in steel concrete hull design, topside development and LNG transfer systems.[6]

Since the mid nineties Shell has been working on its own FLNG technology. This includes engineering and optimalization of its concept related to specific potential project developments in Namibia, Timor Leste/Australia and Nigeria.

In July 2009, Shell signed an agreement with Technip and Samsung allowing for the design, construction and installation of multiple Shell FLNG facilities.[7]


2. Current Projects

Other gas and oil companies are still researching and considering FLNG, with several initiatives planned for the future. The world’s first development of FLNG will be Shell’s Prelude FLNG project, 200 kilometers offshore Western Australia.[8] Shell announced their investment in FLNG on 20th May 2011.

In April 2010 Shell’s FLNG technology was selected as the Sunrise Joint Venture’s preferred option for developing the Greater Sunrise gas fields in the Timor Sea. This followed an extensive and rigorous concept evaluation process against onshore alternative onshore solutions. The Woodside-operated JV is now seeking to engage regulators on the concept selection process.[9] Following the decision by Shell to go ahead with its Prelude FLNG development, the Sunrise project would be the second deployment of Shell’s proprietary FLNG design.

In February 2011, Petronas awarded a FEED contract for an FLNG unit to a consortium of Technip and Daewoo Shipbuilding & Marine Engineering. The facility will be located in Malaysia, although the specific gas field is unknown.[10]

Petrobras has invited three consortiums to submit proposals for engineering, procurement and construction contracts for FLNG plants in ultra-deep Santos Basin waters. A final investment decision is expected in 2011.[11]

Meanwhile, Inpex plans to leverage FLNG to develop the Abadi gas field in the Masela block of the Timor Sea, with final investment decision expected by the end of 2013.[12] Late in 2010, Japan’s Inpex deferred start-up by two years to 2018 and cut its "first phase" capacity to 2.5 million tons/yr (from a previously proposed capacity of 4.5 million tonnes).[13]

ConocoPhillips aims to implement a facility by 2016-19, and has completed quantitative risk analysis of a design that will undergo pre-feed study within 2011.

GDF SUEZ Bonaparte – a joint venture comprising Santos (40%) and GDF SUEZ (60%) – has awarded a pre-FEED contract for the Bonaparte FLNG project offshore Northern Australia. The final investment decision is expected in 2014, with startup planned for 2018. The first phase of the project calls for a floating LNG production facility with a capacity of 2 million mt/year.[14]

Chevron is currently considering an FLNG facility to develop offshore discoveries in the Exmouth Plateau of Western Australia,[15] while ExxonMobil is waiting for an appropriate project to launch its FLNG development.[16]


3. Challenges

Moving LNG production to an offshore setting presents a demanding set of challenges. In terms of design and construction, every element of a conventional LNG facility needs to fit into an area roughly one quarter the size, whilst maintaining the utmost levels of safety, and giving increased flexibility to LNG production.[17]

Once a facility is in operation, wave motion will present another major challenge.[18] LNG containment systems need to be capable of withstanding the damage that can occur when the sea’s wave and current motions cause sloshing in the partly filled tanks. Product transfers also need to deal with the effects of winds, waves and currents in the open seas.

Many solutions to reduce the effect of motion and weather are again to be found in the design, which must be capable of withstanding – and even reducing – wave impacts. In this area, technological development has been mainly evolutionary rather than revolutionary, leveraging and adapting technologies that are currently applied to offshore oil production or onshore liquefaction. For example, traditional LNG loading arms have been adapted to enable LNG transfers in open water, and hose-based solutions for both side-by-side transfers in calmer seas and tandem transfers in rougher conditions are nearing fruition.[19]


4. Advantages

Natural gas is the cleanest burning fossil fuel.[20] It’s also abundant and affordable.[21] Meeting world energy needs by realising the potential of otherwise unviable gas reserves (several of which can be found offshore North West Australia).[22] FLNG technology also provides a number of environmental and economic advantages:

Environmental - Because all processing is done at the gas field, there is no requirement for long pipelines to shore, compression units to pump the gas to shore, dredging and jetty construction, and onshore construction of an LNG processing plant, which significantly reduces the environmental footprint.[23] Avoiding construction also helps preserve marine and coastal environments. In addition, environmental disturbance will be minimised during decommissioning because the facility can easily be disconnected and removed before being refurbished and re-deployed elsewhere.

Economic – Where pumping gas to shore can be prohibitively expensive, FLNG makes development economically viable. As a result, it will open up new business opportunities for countries to develop offshore gas fields that would otherwise remain stranded, such as those offshore East Africa.[24]


5. Operation

The FLNG facility will be moored directly above the gas field. It will route gas from the field to the facility via risers.[25] When the gas reaches the facility, it will be processed to produce gas, LPG (liquid petroleum gas) and condensate (a very light crude oil). The processed feed gas will be treated to remove impurities, and liquefied through freezing, before being stored in the hull. Ocean-going carriers will offload the LNG, as well as the other liquid by-products, for delivery to markets worldwide.[26] The conventional alternative to this would be to pump gas through pipelines to a shore-based facility for liquefaction, before transferring the gas for delivery.[27]


6. Specifications

In the case of Shell’s facility, engineers have managed to fit every component of an LNG plant into an area roughly one quarter the size of a conventional onshore plant. Even so, Shell’s facility will be the largest floating offshore facility ever built – longer than four football fields laid end-to-end. It will measure around 488m long and 74m wide, and when fully ballasted will weigh 600,000 tonnes (roughly six times as much as the USS Nimitz aircraft carrier).[28]

The specifications make Shell’s FLNG facility particularly suited for fields with high production rates for reserves starting at 2 to 3 trillion cubic feet (tcf) and beyond – less than a tenth the size of the Groningen gas field off the Netherlands.[29]


7. Construction

The Shell FLNG facility will be constructed at Samsung’s Geoje Island shipyard in Korea. Some modules may be constructed elsewhere and then transferred to the shipyard for assembly. The facility can remain on station for more than 25 years, and its lifetime can be further extended through overhaul and refurbishment.[30] The hull has a design life of 50 years.


8. Safety

A unique feature of Shell’s FLNG design is its ability to stay safely moored in harsh weather conditions, including category five cyclones. Potentially this results in more uptime of the facility.

In addition, Shell designers have optimised safety on the facility by locating storage facilities and process equipment as far from crew accommodation as possible.[31] Because of this, the accommodation areas of visiting LNG carries are also at maximum distance from safety critical equipment. Safety gaps have been allowed between modules of process equipment so that gas can disperse quickly in the event of a gas leak.[32]


9. External References

  1. ^ http://www.platts.com/weblog/oilblog/2011/03/31/shell_australia.html
  2. ^ http://www.touchoilandgas.com/offshore-production-happen-review-a465-1.html
  3. ^ http://www.ivt.ntnu.no/ept/fag/tep4215/innhold/LNG%20Conferences/1998/Papers/2-1-Naklie.PDF
  4. ^ http://www.touchbriefings.com/pdf/1482/ACF58D.pdf
  5. ^ http://www.epmag.com/archives/print/3666.htm
  6. ^ ,http://www.touchoilandgas.com/offshore-production-happen-review-a465-1.html
  7. ^ http://www.technip.com/en/press/shell-awards-floating-lng-contracts-technip-and-samsung
  8. ^ http://www.platts.com/weblog/oilblog/2011/03/31/shell_australia.html
  9. ^ http://www.shell.com/home/content/media/news_and_media_releases/archive/2010/flng_technology_greater_sunrise_29042010.html
  10. ^ http://www.technip.com/en/press/technip-awarded-key-engineering-contract-flng-malaysia
  11. ^ http://www.upstreamonline.com/live/article202137.ece
  12. ^ http://uk.reuters.com/article/2010/12/21/inpex-indonesia-gas-idUKTOE6BK05Z20101221
  13. ^ http://uk.reuters.com/article/2010/12/21/inpex-indonesia-gas-idUKTOE6BK05Z20101221
  14. ^ http://www.santos.com/library/100111_Pre_FEED_contracts_awarded_for_Bonaparte_LNG.pdf
  15. ^ http://www.theaustralian.com.au/business/chevron-considers-floating-lng-plant/story-e6frg8zx-1225946919561
  16. ^ http://www.upstreamonline.com/live/article254823.ece
  17. ^ http://www.igu.org/html/wgc2006pres/data/wgcppt/pdf/PGC%20Programme%20Committees/PGC%20D/Safety%20and%20technology%20developments%20in%20LNG%20plants,%20terminals%20and%20vessels/9.3EF.06.pdf
  18. ^ http://www.lngworldnews.com/the-netherlands-flng-vessel-as-safe-as-any-other-offshore-facility-shell-says/
  19. ^ http://www.laohamutuk.org/Oil/Sunrise/PotenFLNGBreakthrough.pdf
  20. ^ http://www.ngsa.org/assets/Docs/Issues/NGCleanestBurningFossilFuel.pdf
  21. ^ http://stocksonwallstreet.net/featured/natural-gas-clean-quality-cheap-domestic-abundant.php
  22. ^ http://www.offshore-industry.eu/offshore_v2/?p=536
  23. ^ http://www.seaaoc.com/news-old/shell-receives-green-light-for-prelude-flng
  24. ^ http://www.visiongain.com/Report/568/The-Floating-Liquefied-Natural-Gas-(FLNG)-Market-2011-2021
  25. ^ http://www.2hoffshore.com/documents/papers/Disconnectable%20and%20Relocatable%20Riser%20System%20Solution%20for%20FLNG%20in%20Harsh%20Environment.pdf
  26. ^ http://www-static.shell.com/static/aus/downloads/about_shell/prelude/completeeisdoclowres.pdf
  27. ^ http://www.touchoilandgas.com/offshore-production-happen-review-a465-1.html
  28. ^ http://gastoday.com.au/news/flng_gets_serious/042981/
  29. ^ http://www.laohamutuk.org/Oil/Sunrise/PotenFLNGBreakthrough.pdf
  30. ^ http://gastoday.com.au/news/flng_gets_serious/042981/
  31. ^ http://www-static.shell.com/static/aus/downloads/about_shell/prelude/completeeisdoclowres.pdf
  32. ^ http://www-static.shell.com/static/aus/downloads/about_shell/prelude/chap4lowres.pdf