The Grudziądz tram system is a tram system in Grudziądz, Poland that has been in operation since 1896. Currently, the system is operated by Miejski Zakład Komunikacji w Grudziądzu [pl] (MZK Grudziądz). There is one 9 kilometres (5.6 mi) line in regular operation, one of 2 other lines is occasionally run when part of the network is temporarily closed down or otherwise inaccessible. Grudziądz is the smallest city in Poland to have a tram system.[1] The tram line underwent modernization in 2021[2] and four Moderus Beta low-floor trams were supplied in 2022.[3]

Trams in Grudziądz
Tr4mwajarz
Overview
LocaleGrudziądz, Poland
Number of lines1
Number of stations20
WebsiteOfficial website Edit this at Wikidata
Operation
Began operation13 June 1896
Operator(s)MZK Grudziądz
Technical
System length18.6 km (11.6 mi)
Track gauge1,000 mm (3 ft 3+38 in)
Electrification700 V DC overhead
System map

Tarpno
Legionów – Poliklinika
Legionów – Biblioteka
Legionów – Szkoła
Wybickiego – Solna
Rynek Główny
Al. 23 Stycznia
Al. 23 Stycznia
Al. 23 Stycznia
Chełmińska – Włodka
Dworcowa – Hallera
Chełmińska – Piaskowa
Dworzec Kolejowy
Chełmińska – Bydgoska
Chełmińska – Wiejska
Depot
Chełmińska – Jackowskiego
Chełmińska – Kraszewskiego
Chełmińska – Południowa
Południowa
Konstytucji 3 Maja
Rządz
  single-track sections are marked with thin line
Grudziądz tramway network ()
Legend: existing routes, dismantled routes

Rolling stock

edit
Image Tram type Number

 

Konstal 805Na/Nb 4 (2x2)
  Konstal 805Na-MM

(modernised 805Na)

6 (3x2)
  Duewag GT8 6

 

Moderus Beta MF 28 AC 4
Total 20
Percentage share of low-floor trams 27%
Percentage share of air-conditioned trams 27%

Lines

edit

Regular

edit
Line Route Length in km Average time to circuit (minutes) Number of stops
  TarpnoRządz

Legionów – Wybickiego – Stara – Miłośników Astronomii – Długa – Rynek – Szewska – Klasztorna – Al. 23 Stycznia – Toruńska – Chełmińska – Południowa – Konstytucji 3 Maja

~9 km 20 min 15

Temporary

edit

These lines run only during long-term disruptions (e.g. track or roadworks) that cut off one of the termini from the rest of the network.

Line Route Length in km Average time to circuit (minutes) Number of stops
 1  Dworzec kolejowyTarpno

Dworcowa – marsz. Focha – Al. 23 Stycznia – Klasztorna – Szewska – Rynek – Długa – Miłośników Astronomii – Stara – Wybickiego – Legionów

~4 km 13 min 9
  Dworzec kolejowyRządz

Dworcowa – marsz. Focha – Al. 23 Stycznia – Toruńska – Chełmińska – Południowa – Konstytucji 3 Maja

~7 km 17 min 11

References

edit
  1. ^ "Trams in Poland". Poland Travel Planner. 1 April 2019. Retrieved 10 April 2019.
  2. ^ Bilski, Piotr (2021-03-19). "Grudziądz. Na ul. Toruńskiej ruszyła modernizacja sieci tramwajowej. Na jakim etapie są prace? Zobacz zdjęcia" [Grudziadz - the modernization of the tram network has started on Toruńska Street. How's the progress? See photos]. Grudziadz Naszemiasto (in Polish). Retrieved 2024-09-21.
  3. ^ "Grudziądz tram on test". Railway Gazette International. 2022-05-17. Retrieved 2024-09-21.
edit