Thaltej is the elevated eastern terminal metro station on the East-West Corridor of the Blue Line of Ahmedabad Metro in Ahmedabad, India. This metro station consists of PVR Acropolis (Ahmedabad) along with Mondeal Business Park in West Ahmedabad. This metro station was opened to the public on 30 September 2022.[1][2][3][4]
Thaltej | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ahmedabad Metro station | |||||||||||||||
General information | |||||||||||||||
Location | Thaltej, Ahmedabad, Gujarat 380059 | ||||||||||||||
Coordinates | 23°02′59″N 72°30′58″E / 23.04974°N 72.51621°E | ||||||||||||||
Owned by | Gujarat Metro Rail Corporation Limited | ||||||||||||||
Operated by | Ahmedabad Metro | ||||||||||||||
Line(s) | Blue Line | ||||||||||||||
Platforms | Side platform Platform-1 → Vastral Gam Platform-2 → Train Terminates Here (to be extended to Thaltej Gam metro station in the future) | ||||||||||||||
Tracks | 2 | ||||||||||||||
Construction | |||||||||||||||
Structure type | Elevated, Double track | ||||||||||||||
Platform levels | 2 | ||||||||||||||
Accessible | Yes | ||||||||||||||
Other information | |||||||||||||||
Status | Operational | ||||||||||||||
History | |||||||||||||||
Opening | 30 September 2022 | ||||||||||||||
Electrified | 750 V DC third rail | ||||||||||||||
Services | |||||||||||||||
| |||||||||||||||
|
Station layout
editThaltej track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
** (Further extension to Thaltej Gam metro station in the future) |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Eastbound |
Towards → Vastram Gam Next Station: Doordarshan Kendra | |
Platform 2 Westbound |
Towards ← Train Terminates Here (to be further extended to Thaltej Gam metro station in the near future) | |
Side platform | Doors will open on the left | ||
L2 |
Entry/Exit
editThis section is empty. You can help by adding to it. (August 2023) |
See also
editReferences
edit- ^ "PM Modi inaugurates Ahmedabad Metro first phase, takes a ride". Economic Times India Times. Retrieved 3 January 2022.
- ^ www.ETRealty.com. "Prime minister inaugurates phase-1 of Ahmedabad Metro rail project - ET RealEstate". ETRealty.com. Retrieved 4 October 2022.
- ^ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
- ^ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.