Talk:Welshpool and Llanfair Light Railway
Latest comment: 10 months ago by Geni in topic Nutty is apparently back at the Welshpool and Llanfair Light Railway
This article is rated Start-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||||||
|
The contents of the Golfa Bank page were merged into Welshpool and Llanfair Light Railway on 8 September 2021. For the contribution history and old versions of the redirected page, please see its history; for the discussion at that location, see its talk page. |
The route diagram template for this article can be found in Template:Welshpool and Llanfair Light Railway. |
Table of Locomotives edit
I tried this table on my sandbox with much more detail and other dates, but the wrap-round did not look good. I was thinking that it would make a good introduction to detailed descriptions of the locomotives underneath. eg. -
- No.1 (GWR 822) "The Earl"
- Built/Rebuilt/Bought/Restored/Livery/etc.
Then 'Notes' column on the table can be reduced to just showing which locomotives are still on the line. AHEMSLTD 14:26, 15 January 2006 (UTC)
- Some years later I have altered the table layout to improve the readability of the notes. Comments requested please. Murgatroyd49 (talk) 09:42, 27 October 2022 (UTC)
Loco's edit
Does anyone have any information on Loco. #13? There doesn't seem to be anything in the article... CrossHouses (talk)
Proposed merge of Golfa Bank into Welshpool and Llanfair Light Railway edit
Not notable on own merits Rogermx (talk) 16:23, 28 March 2021 (UTC)
Nutty is apparently back at the Welshpool and Llanfair Light Railway edit
https://www.railadvent.co.uk/2023/06/vertical-boiler-locomotive-arrives-at-new-home-in-wales.html