Talk:Gold Coast railway line

Latest comment: 11 years ago by Ausisit in topic Weekend timetable

Untitled edit

Should this part, "The Gold Coast (Robina) line branches from the Beenleigh at Beenleigh", actually be saying this? "The Gold Coast (Robina) line branches from the Beenleigh line at Beenleigh."

--Randolph 05:31, 25 Mar 2005 (UTC)

Indeed it should - please feel free to change it. Lacrimosus 06:35, 25 Mar 2005 (UTC)

Done. :) --Randolph 10:13, 25 Mar 2005 (UTC)



Is it just me, or do the 'current project' posters in trains at the moment show that there are plans for a Coomera to Helensvale duplication? I swear it's there, but on checking the QR site, there is no mention of this project. 124.171.133.9 (talk) 11:42, 13 March 2009 (UTC)Reply

Line Length edit

Article states that the line length is exactly zero miles/km. Is this due to some technical railway terms being used or a difficulty in calculating. Cls14 (talk) 15:54, 1 November 2010 (UTC)Reply

Standing room only edit

Should the issue of over-crowding at peak times, as discussed in this article, be mentioned. - Shiftchange (talk) 10:59, 30 May 2012 (UTC)Reply

Weekend timetable edit

Due to popularity the Weekend timetable is now the same half hourly timetable as weekdays.

If it would help I have a current timetable I can send you --Ausisit (talk) 03:32, 13 January 2013 (UTC)Reply