Talk:Coatzacoalcos Underwater Tunnel

Mathematical mistake edit

"at a cost of 5.398 billion pesos — a 256% increase "

It's a 156% increase from 2.065 billion pesos to 256% of the original cost.

The source article seems to make this mistake as well but I don't trust my knowledge of Spanish enough to be sure if the distinction is made between those two points.