South Humber Bank Power Station

South Humber Bank Power Station is a 1,365 MW gas-fired power station on South Marsh Road at Stallingborough in North East Lincolnshire north of Healing and the A180 near the South Marsh Road Industrial Estate. It is around two miles east of Immingham, and employs 64 people. The site of SHBPS is around 500 metres by 400 metres in area (around 54 acres). It is next door to the Synthomer plant.[1]

South Humber Bank Power Station
South Humber Bank Power Station
Viewed from the west in August 2007
Map
Official nameSouth Humber Bank Power Station
CountryEngland
LocationSouth Marsh Road, Stallingborough, North East Lincolnshire, DN41 8BZ
Coordinates53°36′11″N 0°08′46″W / 53.603°N 0.146°W / 53.603; -0.146
Construction beganSeptember 1994
Commission dateSeptember 1997
OwnerEP UK Investments
OperatorEP UK Investments
Thermal power station
Primary fuelNatural gas
Combined cycle?Yes
Power generation
Nameplate capacity1266 MW
External links
Websitehttps://www.epuki.co.uk/
CommonsRelated media on Commons

It is owned by EP UK Investments Ltd, which is daughter company of EP Power Europe, which is 100% owned by Czech energy group EPH (owned by Daniel Křetínský). EPH bought South Humber Bank power station from Centrica in June 2017.[2]

History

edit

The site was chosen by Dalton Warner Davis, the Chartered Surveyors.[3]

Construction started in September 1994. Phase 1 was completed in April 1997 with 750 MW of power, and entered commercial service in September 1997. Phase 2 was started in November 1996 and was completed in January 1999, adding 510 MW.[4] The plant was built by Switzerland's ABB.

Ownership

edit

It was initially run by IVO Generation Services, a company owned by Finland's Fortum (Imatran Voima Oy). The site was owned by the consortium Humber Power Ltd, which was owned by Midland Power, ABB Energy Ventures, Tomen Group, Fortum Group, British Energy and TotalFinaElf. Humber Power Ltd was formed in 1991.

On 29 May 2001, Centrica (as GB Gas Holdings Ltd) bought 60% of the power station, and with 40% owned by Chanter Petroleum (part of TOTAL Midstream Holdings UK Ltd) from Humber Power Ltd.[5] The entire site was then run by Centrica, under the name South Humber Power Ltd.

In September 2005, the station was bought[6] (100%) by Centrica, costing £150 million (£46.5 million in cash). Centrica also run Glanford Brigg Power Station and Killingholme A power station.

On 21 June 2017 Centrica agreed to sell the power station to EP UK Investments Ltd as part of a deal that also saw Langage power station change hands between the two companies. EP UK Investments Ltd is fully controlled by EP Power Europe, which is 100% owned by Czech energy group EPH (owned by Daniel Křetínský).[2]

Specification

edit

Cooling water is drawn from the River Humber. It is a CCGT type power station using natural gas.

Phase 1 consists of three 166 MW gas turbines with three heat recovery steam generators. It was designed and built by a consortium of Cockerill Maintenance & Ingénierie (CMI) and International Combustion, and 255 MW steam turbine.

Phase 2 consists of two 169 MW gas turbines, two heat recovery steam generators and a 171 MW steam turbine. It is similar to two CCGTs next-door to each other.

The gas turbines used are ABB Alstom GT 13E2 engines which normally produce 165 MW each. Each gas turbine has 72 EV (conical pre-mix) burners. Exhaust gas leaves each turbine at 540C. The engines spin at 3000 rpm.[7] The gas turbines are each connected to an ABB WY21 TEWAC turbo generator.

Exhaust gas from each gas turbine passes through an individual CMI heat recovery steam generator (HRSG). For Phase 1 the steam passes through an ABB steam turbine connected to an ABB 50WT hydrogen-cooled turbogenerator. For Phase 2 the steam passes through an ABB steam turbine connected to an ABB WY21 TEWAC (air-water-cooled) turbogenerator. The Phase 1 generator is larger than Phase 2 so needs to be cooled by hydrogen gas.

 
View in October 2005

The terminal voltage of the generators is 15.75 kV. Electricity enters the National Grid via a transformer at 400 kV connected to a single pylon line. The engines can generate electricity for base load or for peak load operations. Performance of the power plant is dependent on local air temperature and humidity. It has a nominal thermal efficiency of 55%, but usually produces 51%.

In 2009 it produced 8,512 GWh of electricity.[8]

References

edit
  1. ^ "Synthomer". Archived from the original on 16 July 2011. Retrieved 28 September 2011.
  2. ^ a b "EPH to buy Langage and South Humber Bank gas-fired power stations from Centrica - ENERGETICKÝ A PRŮMYSLOVÝ HOLDING, a.s." ENERGETICKÝ A PRŮMYSLOVÝ HOLDING, a.s. Retrieved 5 February 2018.
  3. ^ "Dalton Warner Davis". Retrieved 28 September 2011.[dead link]
  4. ^ "ABB receives US$ 270-million power plant extension order in the U.K." Retrieved 28 September 2011.
  5. ^ "Centrica and TotalFinaElf's completed acquisition of Humber Power Limited" (PDF). OFGEM. 19 June 2001. Retrieved 28 September 2011.
  6. ^ "Total Sells Its Interest in the UK's South Humber Bank Power Plant". Archived from the original on 6 July 2008. Retrieved 28 April 2008.
  7. ^ "South Humber Bank Power Station PPC Permit Application Application Reference No MP3235LY" (PDF). Centrica. Archived from the original (PDF) on 6 April 2012. Retrieved 28 September 2011.
  8. ^ "South Humber Bank" (PDF). Centrica. Archived from the original (PDF) on 6 April 2012. Retrieved 28 September 2011.
edit

News items

edit