Sáenz (Buenos Aires Underground)

Sáenz is a station Under construction and the future terminus of Line H of the Buenos Aires Underground.[1] Once complete, the station will connect with the Belgrano Sur commuter rail line and the Metrobus Sur BRT line in a new facility designed for the connection of the three lines.

Sáenz
General information
PlatformsIsland platforms
Connections Belgrano Sur Line
History
Opening2020s
Services
Preceding station Buenos Aires Underground Following station
Hospitales Line H Terminus

Construction began in 2012, along with Facultad de Derecho, Las Heras, Santa Fe and Córdoba stations; however, it was decided to prioritise the northern extension and Sáenz will open in the 2020s instead of with the other stations in 2015.[2]

References edit

  1. ^ "New Line H". Subterraneos de Buenos Aires. Archived from the original on April 18, 2011.
  2. ^ "Empezarán en enero las obras de las nuevas estaciones de la línea H" [Works start in January of the new stations of line H]. EnElSubte (in Spanish). December 15, 2011.