Line M13, officially referred to as the M13 Söğütlüçeşme–Yenidoğan line, is a rapid transit line of the Istanbul Metro system, currently being constructed in the Asian part of Istanbul, Turkey.

M13 Söğütlüçeşme–Yenidoğan
Overview
StatusUnder construction
Emek - Yenidoğan

In Project Phase
Söğütlüçeşme - Emek
OwnerIstanbul Metropolitan Municipality
LocaleIstanbul, Turkey
Termini
  • Söğütlüçeşme
  • Yenidoğan
Stations16
Service
TypeRapid transit
SystemIstanbul Metro
Services1
Operator(s)Metro İstanbul
Rolling stockCAF Euros
Technical
Line length25 km (16 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC Overhead line

Built by the Istanbul Metropolitan Municipality, the line will be 25 km (16 mi) long with 16 stations, and is expected to go into service sometime in the 2020s.

The tender of this project was cancelled on 3 January 2018.[1] A plan to build the line was once again started in June 2023,[2][3] with construction on the section between Emek and Yenidoğan beginning on 10 March 2024.[4]

Stations edit

No Station District Connections Type Notes
1 Söğütlüçeşme Kadıköy     Underground Kadıköy Municipality • Fenerbahçe Şükrü Saracoğlu Stadium
2 Şehir Hastanesi Dr. Süleyman Yalçın City Hospital
3 Göztepe  

İETT Bus: 3A, 8E, 9K, 10E, 10G, 11T, 13M, 13Y, 14A, 14B, 14BK, 14ES, 15BK, 15ÇK, 15SK, 16A, 16B, 16C, 16F, 16KH, 16M, 16S, 16U, 16Y, 16Z, 17K, 17P, 18A, 18E, 18K, 18M, 18Ü, 18V, 18Y, 19, 19A, 19B, 19E, 19FK, 19H, 19T, 19Z, 20D, 20E, 20K, 20Ü, 21B, 21C, 21G, 21K, 21U, 129T, 130, 130A, 130Ş, 202, 251, 252, 319, 320A, E-10, E-11

Göztepe Mosque
4 Libadiye Üsküdar Emaar Square Mall
5 Gençlik Parkı Gençlik Park
6 Finanskent Ümraniye    (Finans Merkezi)

İETT Bus: 8K, 8Y, 11M, 13B, 13H, 13M, 13Y, 14BK, 19FS, 20D

7 Ataşehir[a] Ataşehir
8 Şerifali Ümraniye Turgut Özal Boulevard
9 İMES  

İETT Bus: 14A, 14AK, 14CE, 14S, 14T, 14TM, 14ÇK, 14ŞB, 19D, 19E, 19EK, 19ES, 19S, 19SB, 19V, 320

İMES・Dudullu Organized Industrial Site
10 Esenkent[b] Kadosan Auto Industry Site
↑↑ Under Planning ↑↑
11 Emek Sancaktepe Underground Sancaktepe Martyr Prof. Dr. İlhan Varank Hospital
12 Sarıgazi  

İETT Bus: 11,11SA, 11V, 11ÜS, 14, 14YK, 19A, 19EK,Ü 19S, 19SB, 122H, 122V, 131, 131A, 131B, 131C, 131H, 131K,131Y, 131Ü, 132YM, 522B, 522ST, 622, UM60, UM61, UM73

Sancaktepe Governorship
13 Aydınlar Çekmeköy Sultangazi Avenue・Demokrasi Avenue
14 Cumhuriyet Turgut Özal Avenue
15 Yenidoğan Sancaktepe Yenidoğan Middle School・Yenidoğan Anatolian High School

Notes edit

  1. ^ Not to be confused with Ataşehir on the M12 line.
  2. ^ Not to be confused with Esenkent on the M7 line.

References edit

  1. ^ "6 metro projesinde ihale iptali". Milliyet (in Turkish). Retrieved 2018-01-03.
  2. ^ "The project of the M13 Söğütlüçeşme-Yenidoğan Metro Line is from Metro Istanbul". Metro Istanbul. Istanbul Metropolitan Municipality. 2023-06-20. Retrieved 2024-03-19.
  3. ^ "M13 Söğütlüçeşme-Yenidoğan Metro Hattı'nın uygulamaya esas kesin projesini Metro İstanbul yapacak" [M13 will be built by Metro Istanbul]. Günlük Taahhüt Haber (in Turkish). 2023-06-21. Archived from the original on 2024-03-19. Retrieved 2024-03-19.
  4. ^ "Yenidoğan-Söğütlüçeşme Metro Hattının İlk Etabının Yapım Çalışmalarını Başlattı" [Construction Works of the First Stage of Yenidoğan-Söğütlüçeşme Metro Line Started]. İBB Ulaşım Yönetim Merkezi (in Turkish). Istanbul Metropolitan Municipality. 2024-03-11. Archived from the original on 2024-03-19. Retrieved 2024-03-19.