Line 25 of the Shenzhen Metro is a line under construction, which will connect across Shenzhen through the districts of Luohu, Longhua, Longgang and Bao'an for 38.5 kilometers and 30 stations.[1] Construction started on 26 February 2024. The first phase of Line 25 has entered Phase V planning, and will run from Jihua Hospital in Longgang District to Shilong in Bao'an District, with 14 stations and 16.2 kilometers of track.[2] The line is proposed to use 6 car type B trains.[3]
Line 25 |
---|
25 |
|
Status | Under construction |
---|
Locale | Shenzhen, Guangdong |
---|
Termini | |
---|
Stations | 14 (Phase 1) |
---|
|
Type | Rapid transit |
---|
System | Shenzhen Metro |
---|
Services | 1 |
---|
Operator(s) | SZMC (Shenzhen Metro Group) |
---|
|
Line length | 16.2km (Phase 1) |
---|
Character | Underground |
---|
Operating speed | 80km/h |
---|
Stations (Phase 1)
edit
References
edit