Line 1 (Guiyang Metro)

Line 1 of the Guiyang Metro, is a subway line in Guiyang.

Line 1
 1 
Overview
StatusOperational
LocaleGuiyang, Guizhou Province, China
Termini
Stations25
Websitehttp://www.gyurt.com/
Service
TypeRapid transit
SystemGuiyang Metro
Operator(s)Guiyang Urban Rail Transit (GYURT)
Depot(s)2
History
Opened28 December 2017; 6 years ago (2017-12-28)
Technical
Line length35.11 km (21.82 mi)[1][2]
Number of tracks2
CharacterUnderground & Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead line
Operating speed80 km/h
Current plan map of Guiyang Metro
Current plan map of Guiyang Metro

The northern section (Guanshanhu section) opened on December 28, 2017.[3] The northern section has 10 stations and is 12.9 kilometres (8.0 mi)[3] long, from Xiamaixi to Guiyangbei Railway Station. The southern section was opened on December 1, 2018.[1][4] Douguan station opened on December 28, 2019.

Opening timeline edit

Segment Commencement Length Station(s) Name
Xiamaixi — Guiyangbei Railway Station 28 December 2017 12.9 km (8.02 mi)[3] 10 Phase 1 (Guanshanhu section)
Guiyangbei Railway Station — Xiaomeng Industrial Park 1 December 2018 14 Phase 1 (Southern section)
Douguan — Xiamaixi 28 December 2019 1 Phase 1 (one-station extension)

Stations edit

station name Connections Distance
km
Location
English Chinese
Douguan 窦官 Guanshanhu
Xiamaixi 下麦西
Laowantang 老湾塘
Yueshanhu Park 阅山湖公园
West Lincheng Road 林城西路  2 
Guanshanhu Park 观山湖公园
International Eco-Conference Center 国际生态会议中心  T2  (U/C)
Yangguan 阳关
Xinzhai 新寨
Bailuhu 白鹭湖
Guiyangbei Railway Station 贵阳北站  GK    KQW
Yaguan 雅关 Yunyan
Nanya Road 南垭路
Bageyan 八鸽岩
Beijing Road 北京路  3 
Penshuichi 喷水池  2 
West Zhongshan Road 中山西路
Hebin Park 河滨公园 Nanming
Guiyang Railway Station 贵阳火车站   GIW
Shachong Road 沙冲路
Wangchengpo 望城坡
Zhujiang Road 珠江路 Huaxi
Changjiang Road 长江路
Qingshuijiang Road 清水江路
Xiaomeng Industrial Park 小孟工业园

Notes edit

References edit

  1. ^ a b "贵阳市轨道交通1号线全线正式开通初期运营". 2018-12-01. Archived from the original on October 25, 2019.
  2. ^ "贵阳轨道交通1号线全线开通运营 全长35.11公里设25座车站". 2018-12-01.
  3. ^ a b c "贵阳地铁驶来:1号线观山湖段试运行". Xinhua. Guiyang Daily. Archived from the original on December 28, 2017. Retrieved 20 July 2017.
  4. ^ "刚刚定了!贵阳地铁1号线,12月1日全线通车_新闻频道_中国青年网".