Line 19 of the Shenzhen Metro is a line under planning, which will connect the districts of Longgang and Pingshan for 33 kilometers and 18 stations.[1] Construction is planned to begin in 2023. The first phase of Line 19 has entered Phase V planning, and will run from Nantangwei to Julong in Pingshan District, with 12 stations and 12.5 kilometers of track.[2][3] The line is proposed to use 6 car type B trains.[4]
Line 19 |
---|
19 |
|
Status | Under planning |
---|
Locale | Shenzhen, Guangdong |
---|
Termini | |
---|
Stations | 12 (Phase 1) |
---|
|
Type | Rapid transit |
---|
System | Shenzhen Metro |
---|
Services | 1 |
---|
Operator(s) | SZMC (Shenzhen Metro Group) |
---|
|
Line length | 12.5km (Phase 1) |
---|
Character | Underground |
---|
Operating speed | 80km/h |
---|
Stations (Phase 1)
edit
References
edit