55°39′52″N 21°08′16″E / 55.664457°N 21.137649°E
Klaipėda liquefied natural gas floating storage and regasification unit terminal | |
---|---|
Location | |
Country | Lithuania |
Location | Kiaulės Nugara, Klaipėda |
Details | |
Opened | 2014 |
Owned by | KN Energies |
Type of harbour | liquified natural gas terminal |
No. of berths | 1 (Platform for LNG tankers) |
Statistics | |
Website www |
Klaipėda LNG terminal (Lithuanian: Klaipėdos suskystintų gamtinių dujų terminalas) is a liquefied natural gas import terminal in the port of Klaipėda, Lithuania. It cost US$128 million to construct.[1] The developer and owner of the project is KN Energies.
The terminal started operating on 3 December 2014.[2] After the completion of the Klaipėda LNG FSRU, Lithuania became the fifth country in the world to use FSRU technology for liquefied natural gas.[3]
History
editOn 22–27 January 2014 pilot test was conducted in order to assess the FSRU Independence's performance and seaworthiness. Later on the vessel sailed to the sea and the ship's sea trial lasted nearly a week. Earlier, in the beginning of January the ship's propulsion system was tested, later crew safety equipment and other range of testing conducted.[4] It was delivered in March 2014 and was reached the terminal on 27 October 2014.[5]
In June 2014 supplying platform was finished to be built in Kiaulės Nugara.[6] It is one of the four main elements of 450-metre (1,480 ft) length embankment (together with mounting and mooring field, steel bridges and high-pressure gas platform).
On 27 October 2014 the main vessel arrived to Klaipėda's Port. The welcoming ceremony of Independence arrival was broadcast live by national broadcaster LRT televizija, while the ship was greeted by Lithuanian President Dalia Grybauskaitė. Representatives from Latvia, Estonia, Norway, the United States, Finland, Sweden and European Council also participated at the opening.[7]
On 3 December 2014 the terminal started operating.[2]
On 27 October 2017, LNG Distribution Station at Klaipėda Port started operating. Station is dedicated to create a comprehensive LNG logistics chain in the Baltic region.[8]
On 7 January 2019, the world's largest liquefied natural gas bunkering vessel Kairos, owned by KN and German company Nauticor, was launched at that time. The ship's main activity in Klaipėda port is to transport LNG from the LNG terminal to LNG distribution station.[9] In September 2019, Klaipėdos Nafta sold its shares in Kairos, the company that owns the bunkering vessel Kairos.
Storage and regasification vessel
editFSRU Independence, an LNG carrier built by Hyundai Heavy Industries, is designed as a floating LNG storage and regasification unit for the terminal. It is leased from Höegh LNG for 10 years with an option of buyout.[1] It has a maximum capacity to handle of almost 4 billion cubic metres per annum (140 billion cubic feet per annum) of natural gas (2.2 million tonnes of LNG), while it has four storage tanks with total capacity of 170,000 cubic metres (6,000,000 cu ft).[1][10] Lithuania also has access to the Inčukalns underground gas storage facility in Latvia.[11]
Supply
editEquinor is contracted to supply LNG for five years to cover the minimum operational need of the terminal.[1] In 2015, Equinor will supply 540 million cubic metres (19 billion cubic feet) of natural gas.[12] The first test cargo was delivered on 28 October 2014 by LNG tanker Golar Seal.[13] Gas was originating from the Snøhvit field (Melkøya LNG plant). It was imported by Litgas, a subsidiary of Lietuvos Energija.[10]
Awards
editAt the 8th European Gas Conference 2015 in Vienna, Austria Klaipėda LNG FSRU won the Project of the Year award.[14]
Supporting infrastructure
editPreviously Klaipėda was only connected to one main pipeline of Klaipėda–Panevėžys pipeline within Lithuanian gas grid.[15]
To ensure continuous supply of gas from Klaipėda LNG FSRU to Lithuanian gas market, additional main gas pipelines built, connecting to the terminal:
- Klaipėda–Jurbarkas pipeline, opened in 2013.[16]
- Klaipėda–Kuršėnai pipeline, opened in 2015.[17]
See also
edit- Energy in Lithuania
- Gas Interconnection Poland–Lithuania – Natural gas pipeline
- List of LNG terminals
- Świnoujście LNG terminal – LNG terminal in Poland
- Inkoo LNG terminal – LNG terminal in Finland
References
edit- ^ a b c d Seputyte, Milda (27 October 2014). "Lithuania Grabs LNG in Effort to Curb Russian Dominance". Bloomberg Businessweek. Bloomberg. Archived from the original on 27 October 2014. Retrieved 27 October 2014.
- ^ a b Pradeda veikti SGD terminalas. Vakarų ekspresas, 2014-12-03
- ^ World's LNG Liquefaction Plants and Regasification Terminals
- ^ "FSRU 'Independence' successfully sailed off on a sea trial". Archived from the original on 11 February 2014. Retrieved 11 February 2014.
- ^ Į Klaipėdą atplaukė laivas "Independence"
- ^ Masiulis apie SkGD: jau matyti pabaigos pradžia
- ^ "Floating LNG terminal "Independence" sails into Klaipėda". Delfi. 27 October 2014. Retrieved 28 October 2014.
- ^ "Kn - Kuriame Nepriklausomybę".
- ^ "Kn - Kuriame Nepriklausomybę".
- ^ a b "Golar Seal to deliver Lithuania's first LNG cargo". Argus Media. 27 October 2014. Retrieved 27 October 2014.
- ^ "For the first time natural gas from Lithuanian LNG terminal will be stored in the Latvian Inčukalns storage facility". Ministry of Energy of Lithuania. 26 June 2017. Retrieved 6 January 2022.
- ^ "Lithuania Looks To LNG Terminal To Breaking Russian Monopoly". RFE/RL. 27 October 2014. Retrieved 27 October 2014.
- ^ Bandomasis dujų krovinys - jau Klaipėdoje. Vakarų ekspresas, 2014-10-28
- ^ Lithuanian LNG terminal wins European gas project of the year award
- ^ "Magistralinio dujotiekio trasa. Gyventojai nerimauja dėl kompensacijų dydžio". tzinios.lt. Retrieved 5 February 2021.
- ^ „Amber Grid“ užbaigė magistralinio dujotiekio Jurbarkas–Klaipėda statybą. 15min.lt. Nuoroda tikrinta 2022-02-27.
- ^ Pradeda veikti strateginis dujotiekis Klaipėda–Kuršėnai