This article needs additional citations for verification. (September 2014) |
Lingkaran Tengah Utama Expressway, previously known as Central Spine Road (CSR) or Kuala Krai–Kuala Pilah Highway, Federal Route 34, is a new toll-free highway under construction in the center of Peninsular Malaysia. The 325 km (201 miles) highway is built to eventually replace the former two-lane Malaysia Federal Route 8 (Gua Musang Highway) and Malaysia Federal Route 9 (Karak–Tampin highway). Construction of CSR starts at Package 3 which is from Merapoh to Kampung Relong. It commences at Package 3 as the Gua Musang Highway passes through Chegar Perah which is prone to roadkill. The highway has a long eco-viaduct built in this section. Package 5 which is from north Raub to Karak will be built next, which will connect it to E8 Kuala Lumpur–Karak Expressway bypassing Bentong and Mempaga. This will help detour traffic from the steep mountainous grade between Raub and Bentong. It was formerly known as Central Spine Expressway.
Federal Route 34 | |
---|---|
Kuala Krai–Kuala Pilah Highway, Central Spine Road Lebuhraya Kuala Krai–Kuala Pilah, Jalan Utama Tengah | |
Route information | |
Length | 340 km (210 mi) |
Existed | 2012–present |
History | Expected to be completed in 2026 |
Major junctions | |
North end | Kuala Krai, Kelantan |
FT 34 Kota Bharu–Kuala Krai Expressway FT 8 Federal Route 8 FT 185 Simpang Pulai–Kuala Berang Highway East Coast Expressway FT 2 AH141 Kuala Lumpur–Karak Expressway FT 2 Federal Route 2 FT 9 Federal Route 9 | |
South end | Simpang Pelangai, Pahang / Kuala Pilah, Negeri Sembilan |
Location | |
Country | Malaysia |
Primary destinations | Gua Musang Sungai Yu Chegar Perah Kampung Relong Kuala Lipis Raub / Sungai Ruan Bentong Karak Mempaga Kuala Pilah Bahau Seremban |
Highway system | |
History
edit- Phase 1 is a 51 km stretch from Kuala Krai to Jambatan Sungai Lakit in Kelantan.
- Phase 2 spans 63 km from Jambatan Sungai Lakit to Gua Musang in Kelantan
- Phase 3 covers 107 km from Gua Musang to Kampung Relong in Pahang.
- Phase 4 comprises 56 km from Kampung Relong to Raub in Pahang
- Phase 5, 54 km from Raub to Bentong
- Phase 6, is 47 km and connects Bentong and Simpang Pelangai. (this section is deferred)
On 15 December 2016, section 3H (Kg. Kechur to Kg. Sbrg. Jelai) was opened to traffic. As of July 2024, Package One from Kuala Krai to the Sungai Lakit Bridge is 11.59% complete; Package Two from the Sungai Lakit Bridge to Gua Musang is 22.40% complete. Package Three from Gua Musang to Kampung Relong is 84.25% complete; Package Four from Kampung Relong to Raub is 63.69% complete.
Users can now access Package Five from Raub to Bentong, and Package Six from Bentong to the LPT Junction is 30.07% complete.
Features
edit- Four lanes, two on each side[1]
- A long eco-viaduct for wild animals crossing
- Some sections are concrete paved
- Kilometre markers along the road
In most sections, it is built under JKR R5 road standards, allowing maximum speed limit of up to 90 km/h.
From Kampung Sungai Yu to Chegar Perah and from Chegar Perah to Bukit Tujuh, it overlaps Federal Route 8 Merapoh Highway.
There are no sections with motorcycle lanes.
List of interchanges
editThis article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table.(November 2021) |
State | District | Km | Exit | Name | Destination | Notes |
---|---|---|---|---|---|---|
Through to FT 34 Kota Bharu–Kuala Krai Expressway | ||||||
Kelantan | Kuala Krai | Kuala Krai | ||||
FT 34 Lingkaran Tengah Utama Expressway Package 1 Start/End of highway Under construction | ||||||
FT 34 Lingkaran Tengah Utama Expressway Package 1 Under construction | ||||||
Gua Musang | Sungai Lakit Bridge | |||||
FT 34 Lingkaran Tengah Utama Expressway Package 2 Under construction | ||||||
FT 34 Lingkaran Tengah Utama Expressway Package 2 Under construction | ||||||
Gua Musang | ||||||
FT 34 Lingkaran Tengah Utama Expressway Package 3 Under construction | ||||||
Mentara | ||||||
Kelantan Darul Naim Gua Musang district border | ||||||
Kelantan–Pahang border | ||||||
Pahang | Pahang Darul Makmur Lipis district border | |||||
FT 34 Lingkaran Tengah Utama Expressway Under construction | ||||||
FT 34 Lingkaran Tengah Utama Expressway Package 3 (Gua Musang–Kampung Relong) Section 3F JKR border limit | ||||||
Lipis | -- | Kubang Rusa Interchange | FT 8 Merapoh Highway West Kampung Kubang Rusa Merapoh Gua Musang Kuala Krai Kota Bharu FT 185 Simpang Pulai–Kuala Berang Highway Cameron Highland Ipoh Tasik Kenyir Kuala Terengganu East Kampung Sungai Yu Pusat Rekreasi Sungai Yu |
Parclo B-2 interchange | ||
Sungai Yu Eco-Viaduct Eco-Viaduct | ||||||
-- | Sungai Yu Interchange | FT 8 Merapoh Highway West Kampung Sungai Yu Pusat Rekreasi Sungai Yu Merapoh |
Trumpet interchange | |||
-- | Chegar Perah | FT 8 Merapoh Highway West Chegar Perah |
LILO Kuala Krai bound | |||
-- | Chegar Perah | FT 8 Merapoh Highway West Chegar Perah |
LILO Kuala Krai bound | |||
U-Turn | FT 8 Lingkaran Tengah Utama Expressway U-Turn Chegar Perah Sungai Yu Kubang Rusa Mentara Gua Musang Kuala Krai Kota Bharu |
U-Turn south bound Under Construction | ||||
FT 34 Lingkaran Tengah Utama Expressway Package 3 (Gua Musang–Kampung Relong) Section 3F JKR border limit | ||||||
FT 34 Lingkaran Tengah Utama Expressway Under construction | ||||||
FELDA Telang | ||||||
Kampung Kechur | ||||||
FT 34 Lingkaran Tengah Utama Expressway Package 3 (Gua Musang–Kampung Relong) Section 3H JKR border limit | ||||||
Kampung Seberang Jelai | ||||||
FT 34 Lingkaran Tengah Utama Expressway Package 3 (Gua Musang–Kampung Relong) Section 3H JKR border limit | ||||||
FT 34 Lingkaran Tengah Utama Expressway Package 3J Under construction | ||||||
Kampung Relong | ||||||
FT 34 Lingkaran Tengah Utama Expressway Package 3 Under construction | ||||||
FT 34 Lingkaran Tengah Utama Expressway Package 4 Under construction | ||||||
Lipis–Raub district border | ||||||
FT 34 Lingkaran Tengah Utama Expressway Package 5 Under construction | ||||||
Raub | Raub (U) Interchange | FT 8 Federal Route 8 Raub |
Diamond interchange | |||
Raub–Bentong district border | ||||||
Bentong | Raub (S) Interchange | West
FT 1502 FT 218 |
Half diamond interchange | |||
Bentong (U) Interchange | East
FT 1498 Kampung Lebu Northwest FT 8 FELDA Lurah Bilut |
Diamond interchange | ||||
Mempaga Interchange | East
FT 1498 FELDA Mempaga Southwest East Coast Expressway FT 2 AH141 Kuala Lumpur–Karak Expressway |
Roundabout interchange | ||||
6A | Bentong (S) Interchange | North | Half diamond interchange | |||
809 | KLK Interchange | West
East Coast Expressway FT 2 AH141 Kuala Lumpur–Karak Expressway |
Trumpet interchange, entry only westbound | |||
FT 34 Lingkaran Tengah Utama Expressway Under construction | ||||||
Kampung Telemong | ||||||
Mancis | ||||||
FT 34Lingkaran Tengah Utama Expressway Start/End of highway Under construction | ||||||
-- | Simpang Pelangai | Northwest FT 9 Karak FT 9 Mancis Southeast FT 34 Kuala Klawang FT 9 Kuala Pilah FT 51 Seremban |
T-junctions |