The CCU Soccer Complex is a collegiate soccer stadium that was opened in Fall of 2024 at Coastal Carolina University.[5] It replaced the old stadium Coastal Carolina University Soccer Field, when it was torn down in order to reroute University Boulvard along with the construction of the Indoor Practice Facility.

CCU Soccer Complex
Map
AddressConway, SC
United States
Coordinates33°47′57″N 78°59′47″W / 33.799303°N 78.996514°W / 33.799303; -78.996514
OwnerCoastal Carolina University
OperatorC. Carolina Univ. Athletics
TypeSoccer-specific stadium
Record attendance1,577[4]
Construction
Broke ground2023
OpenedAugust 2024; 3 months ago (2024-08)[1]
Construction cost$5 million[2][3]
ArchitectThe Boudreaux Group
General contractorFBI Construction, Inc.
Tenants
Website
goccusports.com/soccer-stadium

It serves at home venue to the men's and women's soccer teams of the University. The total cost of the stadium was $5 million, and included press boxes and scoreboard. A second phase will include game-day locker rooms, restrooms and concessions, and it is expected to be finished in 2025.[2] The venue was built with $3,5 million from the CCU Student Housing Foundation and the rest was donated by former CCU American football coach and CEO of TD Ameritrade Joe Moglia.[2] The University did not disclose the amount gifted by Moglia.[6]

I want to be able to keep that number confidential. Most of the things I’ve given over the span of my lifetime frankly have been anonymous or confidential. For this one it was special enough for the university that they felt it really warranted announcing.[6]

— Joe Moglia about his donation to CCU

The first game at the stadium was a women's soccer contest between Coastal and Richmond. That game ended in a 1–1 draw, with Coastal's Olivia Goretski scoring the first goal in the stadium's history.[7]

References

edit
edit