The topic of this article may not meet Wikipedia's general notability guideline. (January 2024) |
AEC is an elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India.[1][failed verification] Around this metro station holds the main and upcoming Sabarmati HSR Terminal railway station along with AEC Garden Park and Torrent Power Limited.
This phase of the metro system was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.[2][3][4][5]
Station layout
editAEC track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound |
Towards → APMC Next Station: Sabarmati Railway Station | |
Platform 1 Northbound |
Towards ← Sector-1
Next Station: Sabarmati | |
Side platform | Doors will open on the left | ||
L2 |
Entry/Exit
editThis section is empty. You can help by adding to it. (August 2023) |
See also
editReferences
edit- ^ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
- ^ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
- ^ "Ahmedabad: North-South corridor metro service to be operational from October 6". TimesNow. 5 October 2022. Retrieved 12 August 2023.
- ^ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
- ^ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.