Template:WikiProject Los Angeles Rams
(Redirected from Template:SaintLouisRamsproject)
Los Angeles Rams NA‑class High‑importance | ||||||||||||||||||
|
This WikiProject banner template uses Module:WikiProject banner, a meta-template for easily creating and maintaining project banners. Please report any errors or feature requests to Module talk:WikiProject banner. Information or warnings about the template are below:
|
Usage
Please note: This template should be transcluded {{WikiProject Los Angeles Rams}}
and not substituted (subst) because it employs conditional code. Transclusion also allows easy updating of all the project's talk pages without having to edit hundreds of pages.
{{WikiProject Los Angeles Rams
|class=
|importance=
|attention=
|listas=
}}
Field descriptions
- class
-
- Descriptions of the options can be found at Wikipedia:WikiProject Los Angeles Rams/Assessment#Quality scale.
- Options are FA, FL, A, GA, B, C, Start, Stub, FL, List, Category, Disambig, Draft, File, Portal, Project, Template, and NA (Not available). If blank, this will default as Unassessed.
- importance
-
- Descriptions of the options can be found at Wikipedia:WikiProject Los Angeles Rams/Assessment#Importance scale.
- Options are Top, High, Mid, Low, and NA (non-article). If blank, this will default as Unknown importance.
- attention
- Answer yes if the page needs immediate attention; otherwise leave blank.
- listas
- For sorting talk pages, e.g., by last name: Doe, John.