State Route 30 (SR 30), also known as the Tres Rios Freeway, is a planned freeway in the southwest part of the Phoenix metropolitan area. It is planned as a reliever for Interstate 10 five miles to the south and will run through the communities of Buckeye, Goodyear, Avondale, and Phoenix.[1]
Tres Rios Freeway | ||||
Route information | ||||
Maintained by ADOT | ||||
Length | 29 mi[1] (47 km) | |||
Major junctions | ||||
West end | SR 85 in Buckeye | |||
East end | I-17 in Phoenix | |||
Location | ||||
Country | United States | |||
State | Arizona | |||
Counties | Maricopa | |||
Highway system | ||||
| ||||
| ||||
|
In earlier planning stages, the freeway was formerly labeled State Route 801 (SR 801).
SR 30 will be broken into three segments: The western segment from SR 85 to Loop 303, the central segment from Loop 303 to Loop 202, and the eastern segment from Loop 202 to I-17.
Route description
editSR 30 is planned to begin at SR 85 along the Hazen Road alignment, about one mile south of downtown Buckeye. It will then travel northeast for 10 miles before intersecting Loop 303 between Broadway Road and Southern Avenue in Goodyear. SR 30 will then head east for five miles before turning southeast at the Agua Fria River and running along the Southern Avenue alignment for two and a half miles. While along the Southern Avenue alignment, frontage roads will accompany the road to provide access to local communities. SR 30 will then head back northeast for seven miles before intersecting Loop 202 just south of Broadway Road in Phoenix. SR 30 will then continue to travel northeast for four and a half miles before meeting its eastern terminus by intersecting the Interstate 17 at the Durango Curve in Phoenix. SR 30 will be 29 miles (47 km) in length when fully complete.[1][2]
History
editA freeway along the planned SR 30 corridor, titled the Buckeye Expressway, was originally proposed in 1957 as the planned route for Interstate 10 into Phoenix. This plan was later abandoned, and I-10 was re-routed northwards along the present Papago Freeway alignment.[3]
In November 2004, Maricopa County voters approved an extension to an existing sales tax funding regional transportation improvements.[4] A significant portion of those funds will go toward improvements of I-10, which experiences significant volumes of traffic in the southwest part of the Valley. However, rapid growth in the neighboring communities of Buckeye, Goodyear, and Avondale is expected to worsen the congestion on I-10, necessitating the construction of a reliever route.
The Arizona Department of Transportation first identified the need for a route along the current SR 30 corridor in June 2005.[5] The route was planned to run parallel to I-10 five miles to the south through the cities to provide relief. It would run through largely undeveloped land, reducing the impact on residential communities. Due to the extension of the sales tax in 2004, funds were available to help build SR 30.
In response to a budget shortfall brought on by the Great Recession, the Maricopa Association of Governments (MAG) voted to suspend funding to numerous projects in October 2009, including SR 30.[5] While not removing SR 30 from the long-term regional transportation plan, the removal of the funding would effectively postpone the construction of the route until at least 2026. The plan had originally indicated a construction timeline between 2021 and 2025.
In October 2016, it was announced that ADOT was exploring the possibility of building SR 30 as a toll road to accelerate its construction. It was met with mixed reviews from the public and ultimately not approved. The toll feasibility study took six months.[6]
On October 26, 2017, local mayors officially named SR 30 the Tres Rios Freeway after the nearby Gila, Agua Fria, and Salt rivers.[7]
In May 2019, the central segment alternative was approved. It was chosen carefully after four years of study comparing four different possible alternatives.[2]
Current status
editFunding for SR 30 is reliant on an extension of a regional transportation sales tax that currently ends in 2025. That proposed extension was placed on the ballot for Maricopa County voters to vote for in the November 2024 election, known as Proposition 479. If the tax extension is approved, funding would be provided for all three segments. If the tax extension is not approved, that could put the construction of SR 30 in jeopardy.[8]
ADOT is currently in the process of acquiring right-of-way for the central segment. In their five-year plan released in March 2022, ADOT has budgeted funds for this purchase.[9]
Construction of the central segment will not be until at least 2026. There is no timeline for the western and eastern segments yet.[10]
When SR 30 is first constructed, there will be three lanes in each direction. The ultimate configuration allows for four lanes and one high-occupancy vehicle lane (HOV) in each direction.[10]
Exit list
editExit numbers have not yet been assigned. This exit list is based on preliminary studies and may not be the final design plan.[1][2] Mileposts are determined from the western terminus of the SR 30 project. The entire route is in Maricopa County.
Location | mi[1] | km | Destinations | Notes | |
---|---|---|---|---|---|
Buckeye | 0.00 | 0.00 | SR 85 | Planned interchange and western terminus[1] | |
2.10 | 3.38 | Miller Road | Planned interchange[1] | ||
4.20 | 6.76 | Watson Road | Planned interchange[1] | ||
6.50 | 10.46 | Baseline Road | Planned interchange[1] | ||
7.60 | 12.23 | Perryville Road | Planned interchange[1] | ||
Goodyear | 9.80 | 15.77 | Loop 303 north (Bob Stump Memorial Parkway) | Planned interchange[2] | |
11.10 | 17.86 | Cotton Lane | Planned interchange with westbound exit and eastbound entrance[2] | ||
12.10 | 19.47 | Sarival Avenue | Planned interchange with westbound exit and eastbound entrance[2] | ||
13.10 | 21.08 | Estrella Parkway | Planned interchange[2] | ||
14.10 | 22.69 | Bullard Avenue | Planned interchange[2] | ||
Avondale | 16.20 | 26.07 | Dysart Road / El Mirage Road | Planned interchange[2] | |
17.30 | 27.84 | Avondale Boulevard | Planned interchange[2] | ||
18.30 | 29.45 | 107th Avenue | Planned interchange[2] | ||
Phoenix | 20.40 | 32.83 | 91st Avenue | Planned interchange[2] | |
21.45 | 34.52 | 83rd Avenue | Planned interchange[2] | ||
23.35 | 37.58 | 67th Avenue | Planned interchange with eastbound exit and westbound entrance[2] | ||
23.80 | 38.30 | Loop 202 (Ed Pastor Freeway) | Planned interchange[2] | ||
25.10 | 40.39 | 51st Avenue | Planned interchange[1] | ||
27.20 | 43.77 | 35th Avenue | Planned interchange[1] | ||
28.30 | 45.54 | Lower Buckeye Road | Planned interchange[1] | ||
29.00 | 46.67 | I-17 (Black Canyon Freeway) – Flagstaff, Tucson | Planned interchange and eastern terminus[1] | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
editReferences
edit- ^ a b c d e f g h i j k l m n "MAJOR REGIONAL TRANSPORTATION PLAN AMENDMENT Arizona State Route 30" (PDF). Maricopa Association of Governments. May 10, 2017. Retrieved April 21, 2022.
- ^ a b c d e f g h i j k l m n o "State Route 30: Loop 303 to Loop 202 Study". Arizona Department of Transportation. April 28, 2020. Retrieved April 21, 2022.
- ^ "Recommended Major Street and Highway Plan". Retrieved April 29, 2023.
- ^ "About MAG: Proposition 300 and 400". Maricopa Association of Governments. Retrieved February 26, 2022.
- ^ a b "State Route 30 (SR 30) Study – SR 303L to SR 202L Public Hearing" (PDF). Arizona Department of Transportation. May 11, 2019. Retrieved February 26, 2022.
- ^ "ADOT taking closer look at toll road options in Phoenix area". KPNX. October 4, 2016. Retrieved February 26, 2022.
- ^ "New proposed Valley freeway, State Route 30, named 'Tres Rios'". ABC 15 Phoenix. October 26, 2017. Retrieved April 21, 2022.
- ^ Brown, Ben (February 27, 2024). "Prop 479 to extend half-cent sales tax, city leaders warn of 'dire consequences' if initiative fails". ABC 15 Arizona. Retrieved August 4, 2024.
- ^ "2023-2027 Five-Year Transportation Facilities Construction Program" (PDF). Arizona Department of Transportation. March 18, 2022. p. 184. Retrieved April 21, 2022.
- ^ a b "State Route (SR) 30: SR 303L to SR 202L Location/Design Concept Report" (PDF). Arizona Department of Transportation. April 2020. pp. 6, 80. Retrieved November 30, 2022.