The Poch'ŏn Line, also known as Paektusan Rimch'ŏl Line (Mount Paektu Forestry Line), is a former partially electrified narrow gauge line of the Korean State Railway in Ryanggang Province, North Korea, running from Karim on the Samjiyŏn Line to Ryanggang Taep'yŏng.[1]

Poch'ŏn Line
Overview
Other name(s)Paektusan Forest Railway
백두산림철선(白頭山林鐵線)
Native name보천선(普天線)
StatusClosed
OwnerKorean State Railway
LocaleRyanggang
Termini
  • Karim
  • Ryanggang Taep'yŏng
Stations8
Service
TypeHeavy rail
History
Opened1940s
Closed1994
Technical
Line length31.5 km (19.6 mi)
Number of tracksSingle track
Track gauge762 mm (2 ft 6 in)
Electrification1500 V DC Overhead line
(Karim–Poch'ŏn)
Route map

0.0
Karim
Closed
(bridge appx 55 m (180 ft))
3.3
Poch'ŏn
Closed
5.7
Konjangdŏk
Closed
(bridge appx 45 m (148 ft))
(bridge appx 60 m (200 ft))
10.2
Naegok
Closed
(bridge appx 50 m (160 ft))
15.6
Onsu
Closed
(bridge appx 50 m (160 ft))
20.9
Taejin
Closed
(bridge appx 60 m (200 ft))
24.8
Ryŏsu
Closed
(bridge appx 40 m (130 ft))
31.5
Ryanggang Taep'yŏng
Closed
Pochon Line
Chosŏn'gŭl
보천선
Hancha
Revised RomanizationBocheon-seon
McCune–ReischauerPoch'ŏn-sŏn

History

edit

Opened around the same time as the connecting Samjiyŏn Line, extensive flooding in 1994 led to the closure of the line.[2][3]

In August 1980, Kim Il Sung ordered the construction of a new east–west transversal trunk line in the extreme north of the country.[4] To accomplish this, railway engineers planned the new line, called the Pukpu Line, connecting Manp'o in the west with Hoeryŏng in the east to make use of parts of existing lines where possible to reduce the amount of new construction needed.[5] Construction of this line was to take place in three stages. The first stage, completed in 1988, extended the former Unbong Line to Hyesan, resulting in the current Pukpu Line; the second stage was to have connected Hyesan to Musan on the Musan Line,[5] and the third stage was to have connected Musan to Hoeryŏng on the Hambuk Line.[5]

Construction of the second stage was to have made use of parts of existing lines in several places. From Hyesan to Wiyŏn it was to have shared the existing standard gauge trackage of the Paektusan Ch'ŏngnyŏn Line. The plan also included the conversion to standard gauge of four sections of existing narrow gauge lines: from Wiyŏn to Karim, the existing section of the Samjiyŏn line was to have been regauged; from Karim to Poch'ŏn the existing section of the Poch'ŏn Line was to have been regauged, from Rimyŏngsu to Motka, the remaining portion of the Samjiyŏn Line was to have been converted, and from Hŭngam to Musan the existing section of the narrow gauge Paengmu Line was to have been regauged. Then, new track was to be laid between Poch'ŏn and Rimyŏngsu and between Motka and Hŭngam to connect the regauged sections into a complete line.[5] Although some initial work was started on the second stage, the DPRK's financial crisis of the 1990s led to the project being suspended.

Route

edit

A yellow background in the "Distance" box indicates that section of the line is not electrified; a pink background indicates that section is 2 ft 6 in (762 mm) narrow gauge; an orange background indicates that section is non-electrified narrow gauge.

Distance (km) Station Name Former Name
Total S2S Transcribed Chosŏn'gŭl (Hanja) Transcribed Chosŏn'gŭl (Hanja) Connections
0.0 0.0 Karim 가림 (佳林) Samjiyŏn Line
3.3 3.3 Poch'ŏn 보천 (普天) Closed.
5.7 2.4 Konjangdŏk 곤장덕 (棍杖德) Closed.
10.2 4.5 Naegok 내곡 (內曲) Closed.
15.6 5.4 Onsu 온수 (溫水) Closed.
20.9 5.3 Taejin 대진 (大鎭) Closed.
24.8 3.9 Ryŏsu 려수 (麗水) Closed.
31.5 6.7 Ryanggang Taep'yŏng 량강대평 (兩江大坪) P'yŏngmul 평물 (-) Closed.

References

edit
  1. ^ Kokubu, Hayato, 将軍様の鉄道 (Shōgun-sama no Tetsudō), ISBN 978-4-10-303731-6
  2. ^ 北 자재난 심각…2012년 국책사업 줄줄이 ‘중단’, 《데일리NK》, 2009.10.09.
  3. ^ “사람 굶는데 ‘김일성 100년’ 공사 한창”, 《데일리NK》, 2008.10.16.
  4. ^ 북한 북부철길 개건사업 마감단계.. ‘제2의 마식령속도’ 창조
  5. ^ a b c d 북부 철길 건설