Sultan Ismail Petra Airport

(Redirected from Kota Bharu Airport)

Sultan Ismail Petra Airport (IATA: KBR, ICAO: WMKC) is an airport that operates in Kota Bharu, a city in the state of Kelantan in Malaysia. The airport is named after Ismail Petra of Kelantan, the 28th Sultan of Kelantan, who ruled from 1979 to 2010. It is currently undergoing expansion through multiple phases to be international airport, with phase 1 being already completed and opened on 1st May 2024.

Sultan Ismail Petra Airport

Lapangan Terbang Sultan Ismail Petra
Summary
Airport typePublic
OwnerMalaysia Airports
OperatorMalaysia Airports Holdings Berhad
ServesKota Bharu, Kelantan and Besut, Terengganu
LocationPengkalan Chepa, Kelantan, Malaysia
Time zoneMST (UTC+08:00)
Elevation AMSL16 ft / 5 m
Coordinates6°10′02″N 102°17′32″E / 6.1672560°N 102.2922092°E / 6.1672560; 102.2922092
Map
KBR /WMKC is located in Kelantan
KBR /WMKC
KBR /WMKC
Location on the east coast of Malaysia
KBR /WMKC is located in Peninsular Malaysia
KBR /WMKC
KBR /WMKC
KBR /WMKC (Peninsular Malaysia)
KBR /WMKC is located in Malaysia
KBR /WMKC
KBR /WMKC
KBR /WMKC (Malaysia)
KBR /WMKC is located in Southeast Asia
KBR /WMKC
KBR /WMKC
KBR /WMKC (Southeast Asia)
KBR /WMKC is located in Asia
KBR /WMKC
KBR /WMKC
KBR /WMKC (Asia)
Runways
Direction Length Surface
m ft
10/28 2,400 7,874 Asphalt
Statistics (2023)
Passenger1,251,330 (Decrease 15.1%)
Airfreight (tonnes)1,073 (Increase 38.4%)
Aircraft movements24,481 (Decrease 19.6%)
Sources: official website[1]
AIP Malaysia[2]
Boarding Gate view of Sultan Ismail Petra Airport before expansion

It is the second oldest airport in Peninsular Malaysia[3] and the busiest airport in East Coast.

History

edit

The airport is a former RAF Station base, RAF Kota Bharu and a former British military airfield. It was the landing site of the Japanese invasion of Malaya during World War II. The scene of the first Japanese landing in Malaya was on 8th December 1941.

After the war, the RAF military airfield was turned into a civilian airport. The passenger terminal was built and known as Pengkalan Chepa Airport. The inaugural commercial flight to Kelantan occurred on April 6, 1938, following a route survey conducted by Wearne's Air Service. Subsequently, on April 3, 1940, the airline officially launched regular scheduled flights, establishing a connection between Kota Bharu and Singapore, with stops including to Penang and Kuala Lumpur.[4]

Development and expansion

edit

In 1999, the government announced that the Sultan Ismail Petra Airport will be relocated to a new terminal building. The project started in September 2000 and was completed in June 2002 with a total cost of approximately RM55 million. After the terminal was expanded and a new building was built, it became known as Sultan Ismail Petra Airport. Old terminal was used by Asia Pacific Flight Training flying school. It was then permanently closed to give way for current airport expansion.

In the third quarter of 2008, Malaysia Airports Holdings Berhad built a new hangar, a new apron, new aircraft and helicopter parking bays and made taxiway improvements to cater to the growth of the Asia Pacific Flight Training flying school.

In October 2008, the government announced that it intends to extend the runway to a length of 2,400 m (7,874 ft).

In May 2010, TRC Synergy Bhd's unit, Trans Resources Corp Sdn Bhd has secured a RM45.5 million contract to upgrade the Sultan Ismail Petra airport in Kota Bharu. TRC said its unit received the letter of acceptance from Wira Akil Holdings Sdn Bhd. The letter of acceptance from Wira Akil is subsequent to an award being given by the Ministry of Transport to Wira Akil whereby TRC is named as the sub-contractor for the project. The project started on 14 June 2010 and includes the construction of a taxiway, helicopter pads, a meteorological station and instrument landing system (ILS). The airport runway has been lengthened from 1,981 m to 2,400 m, and can accommodate the Boeing 737-800 and Airbus A320. All works are slated for completion by September 2011.

In February 2013, AirAsia Berhad and Firefly Sdn Bhd signed an agreement with Malaysia Airport Holdings Berhad (MAHB) to make Sultan Ismail Petra Airport their secondary hubs. In July 2015, Malaysia Airports is planning for the expansion Sultan Ismail Petra Airport in Kelantan, which has already exceeded its 1.5 million capacity. The building will be expanded to cater to 4 million passengers with a new multi-storey car park and additional aircraft stands (aerobridge) to cope with the expected increase in traffic in the coming decade.

In 2016 Malaysian federal budget (presented October 2015 ), Prime Minister announced RM450 million for upgrading work under The Eleventh Malaysian Plan (Malay: Rancangan Malaysia ke-11) (2016–2020). Works include a new multi-storey car park, additional aircraft stands (aerobridge), apron expansion, enlargement runway/taxiway and a new terminal.

In October 2017, Malaysia Federal Government allocate RM 450 Million for upgrading the airport terminals.

Demolition of previous terminal and relocation to the new building

edit

Previous terminal, now demolished, started operating from 12th September 2002 until 30th April 2024. This terminal adopted the Moorish architecture. It had curved archways and was whiter in colour. The airport had a 12,000 square metre terminal with three aircraft stands. Its three aerobridges were salvaged from the old Subang Airport and refurbished. The terminal accommodated up to 1.45 million passengers a year.

The current, new building of the airport commenced operation on 1 May 2024.[5] The new terminal is expected to receive between 30 to 35 flights and observe an increase in passengers of 4,000 to 4,500 passengers per day. It is equipped with over 20 flight counters and has separate, dedicated lane for future international passengers.

The new terminal has over 20 airline counters, multi-storey car parks, special lanes for taxis, a fire and rescue station, additional space for parking aircraft and an LTSIP cashless operating system for the benefit of passengers. Multi-level car park within the airport is feed by free shuttle bus providing access to the passengers.

The LTSIP expansion and upgrading projects cost RM440mil. Current expansion has entered phase two and scheduled to be completed on January 26, 2025. Upon full completion, the airport will be able to handle 4 million passengers annually.

In May 2024,Prime minister Anwar Ibrahim has agreed to upgrade the airport into an international airport by extending the airport runway by 400m, bringing the total length to 2,800m[6]. One of the following reasons is so that Hajj pilgrims would be able to fly directly to Jeddah from Kota Bharu.[7]

Operating hours

edit

The airport's normal operating hours are between 6:00 a.m. to 12:00 a.m. In the event of flight delays, the airport will remain open until the flight has taken off or has been cancelled.

Airlines and destinations

edit
AirlinesDestinations
AirAsia Johor Bahru,[8] Kota Kinabalu, Kuala Lumpur–International, Kuching
Batik Air Malaysia Kuala Lumpur–International[9]
Firefly Kuala Lumpur–Subang, Penang
Malaysia Airlines Kuala Lumpur–International

Traffic and statistics

edit
Annual passenger numbers and aircraft statistics Source: Malaysia Airports Holdings Berhad[10]
Year
Passengers
handled
Passenger
% Change
Cargo
(tonnes)
Cargo
% Change
Aircraft
Movements
Aircraft
% Change
2003 589,950   315   10,010  
2004 639,871   +8.5 235   -25.4 11,869   +18.6
2005 635,397   -0.7 168   -28.5 11, 194   -5.7
2006 678,306   +6.7 210   +25.0 38,352   +242.6
2007 759,316   +12.0 163   -22.4 58,996   +53.8
2008 836,060   +10.1 181   +11.0 57,102   -3.2
2009 1,003,162   +20.0 185   +2.2 74,863   +31.1
2010 1,047,755   +4.4 177   -4.3 75,906   +1.4
2011 1,132,345   +8.1 164   -7.3 64,114   -15.5
2012 1,259,205   +11.2 147   -10.4 50,991   -20.5
2013 1,585,238   +25.9 179   +21.8 50,406   -1.1
2014 1,800,836   +13.6 397   +121.6 44,628   -11.5
2015 2,063,747   +14.6 1,003   +152.5 42,810   -4.1
2016 2,062,248   -0.1 780   -22.2 31,956   -25.4
2017 1,988,212   -3.6 775   -0.7 30,433   -4.8
2018 1,688,625   -15.1 1,073   +38.4 24,481   -19.6
2019 1,823,089   +8.0 1,250   +16.6 25,383   +3.7
2020 711,480   -61.0 545   -56.4 13,460   -47.0
2021 501,930   -29.5 441   -18.9 9,527   -27.4
2022 1,384,903   +175.9 988   +123.8 19,027   +99.7
2023 1,583,288   +14.3 639   -35.3 18,403   -3.3

Charter operators

edit

MHS Aviation

edit
  • MHS Aviation is the leading provider of helicopter charter services in Sultan Ismail Petra Airport. Specializing in the movement of personnel, ferrying workers to and from offshore production platforms, equipment to and from the offshore installation and drilling rigs mainly for oil companies in the Malaysia-Thailand joint development area, South China Sea.

Weststar Aviation

edit

Helistar Resources Sdn. Bhd.

edit
  • Helistar Resources Sdn. Bhd. is the latest charter offshore helicopter operator which operates to transport rig workers from this airport to oil and gas platforms in the Malaysia-Thailand joint development area, South China Sea.
  • The air operator serves two groups of contractors. Each group of contractors also formed operating companies for exploration. They were:

Block A-18:

  • Contractors: PC JDA Ltd (50% share in the contract), Hess Oil Company of Thailand (JDA) Ltd (49.5%) and Hess Oil Company of Thailand Inc (0.5%)
  • Operator: Carigali Hess Operating Company Sdn Bhd

Blocks B-17 and C-19:

  • Contractors: PTTEP International Limited (50%), PC JDA Ltd (50%)
  • Operator: Carigali-PTTEPI Operating Company Sdn Bhd
edit

See also

edit

References

edit
  1. ^ Sultan Ismail Petra Airport, Kota Bharu at Malaysia Airports Holdings Berhad
  2. ^ "AIP Supplement Malaysia" (PDF). Department of Civil Aviation Malaysia. 14 July 2011. Retrieved 25 January 2016.
  3. ^ "Sultan Ismail Petra Airport, Kota Bharu, Kelantan". klia2 info. 2022-11-19. Retrieved 2024-08-05.
  4. ^ "Air Service to Kota Bharu Begins Today", Pinang Gazette and Straits Chronicle, 1940-01-31, retrieved 2024-01-25
  5. ^ "New Terminal At Sultan Ismail Petra Airport Begins Operations Today". Bernama. 1 May 2024. Retrieved 4 August 2024.{{cite news}}: CS1 maint: url-status (link)
  6. ^ Abdullah, Sharifah Mahsinah (2024-05-13). "Loke: Sultan Ismail Petra Aiport runway to be extended by 400m | New Straits Times". NST Online. Retrieved 2024-08-05.
  7. ^ "LTSIP to be upgraded to an international airport, says Anwar". The Star. Retrieved 2024-05-03.
  8. ^ Liu, Jim. "AirAsia 4Q20 Malaysia domestic network additions". Routesonline. Retrieved 20 October 2020.
  9. ^ "Batik Air Sets Its Sights on Enhancing Domestic Connectivity From KLIA". 22 December 2023.
  10. ^ "Malaysia Airports: Airports Statistics 2020" (PDF). malaysiaairports. 2 April 2021. Retrieved 5 October 2021.
edit