Inverness and Ross-shire Railway

The Inverness and Ross-shire Railway was a Scottish railway company formed in 1860 to build a line from Inverness to Invergordon. It opened in 1862 as far as Dingwall and in 1863 to Invergordon. It was extended to a Bonar Bridge station in 1864. It provided the basis for later extensions that eventually reached Thurso, forming the Far North Line. The Dingwall and Skye Railway branched off at Dingwall to reach the Kyle of Lochalsh.

Inverness and Ross-shire Railway
Overview
LocaleScotland
Dates of operation11 June 1862–30 June 1862
SuccessorInverness and Aberdeen Junction Railway
Technical
Track gauge1,435 mm (4 ft 8+12 in)
Length57.5 miles (92.5 km)
Inverness and
Ross-shire Railway
Ardgay
Mid Fearn Halt
Edderton
Meikle Ferry
Tain
Fearn
Nigg
Kildary
Delny
Invergordon
Alness
Evanton
Foulis
Dingwall
Conon
Muir of Ord
Beauly
Clunes
Lentran
Bunchrew
Clachnaharry
River Ness Viaduct
Rose Street Junction
Welsh's Bridge Junction
Millburn Junction

In 1862 it amalgamated with the Inverness and Aberdeen Junction Railway and later became a constituent of the Highland Railway. The line continues in use at the present day.

First railways

edit
 
The Inverness and Ross-shire Railway system

Aberdeen obtained a railway connection to the south in 1850. The advantages to a community that had a railway service were already plainly visible, as were the serious disadvantages in not being so connected, and interested persons in Inverness started to think about their situation.[1]

At the time a railway heading directly south towards Perth was not technically feasible, and attention was given to reaching Aberdeen, and getting a connection southwards by that circuitous route. A first step in that direction was the opening of the Inverness and Nairn Railway in 1855. This was described at the time as being only a beginning. The Nairn line was on easy terrain in the coastal strip, and any extension would be over more challenging ground.[2]

Thoughts in Inverness turned also to the possibilities of a northward railway. At first this was expected to be by ferry crossing from Nairn to the north side of the narrows of the Cromarty Firth; from there railways could extend on easier ground to Invergordon, Tain and Dingwall.[3]

Inverness and Ross-shire Railway authorised

edit
 
Joseph Mitchell

In the years immediately following, confidence in engineering projects -- encouraged by the local engineer Joseph Mitchell led to a more practical scheme from Inverness directly round the western extremity of the Beauly Firth and then northwards. Sir Alexander Matheson of Ardross was the driving force in ensuring the formation of a company to carry out this work, encouraged by the far-sighted engineer Joseph Mitchell, and a provisional committee met in Inverness in January 1859 to promote such a line.

 
Alexander Matheson

Inverness and Ross-shire Railway Act 1860
Act of Parliament
 
Citation23 & 24 Vict. c. cxxxi
Dates
Royal assent3 July 1860
Other legislation
Repealed byHighland Railway Act 1865
Status: Repealed

So it was that the Inverness and Ross-shire Railway Bill was unopposed in Parliament, and was given royal assent on 3 July 1860, for a line from Inverness to Invergordon, a distance of 31 miles (50 km). This included a crossing of the Caledonian Canal by swing bridge,[3][4] considered by Ross to be a novelty at the time, and river crossings of the Beauly, Conon, Sgitheach, Allt Graad, and Alness Rivers. Authorised share capital was £215,000.[5]

Construction and opening

edit
 
The Ness railway viaduct at the time of opening

The Inverness station of the Nairn company faced east, and the Ross-shire line would approach from the west, so west facing platforms were built at the station; there was a by-pass line, originally provided as the Nairn company's approach to Nairn Harbour, on Shore Street. When the line was opened it was referred to as the Rose Street Curve.[3]

On 10 June 1862 Colonel Yolland of the Board of Trade carried out an inspection of the first section of the line and approved it, and on 11 June 1862 the first section of the route opened, from Inverness to Dingwall.[3] The remainder of the route was delayed by a dispute over land acquisition, but on 25 March 1863 the line was opened throughout to Invergordon.[note 1][4][6][7]

The extension to Invergordon was at first considered to be a feeder to the southward line, rather than a step towards the Far North.[7]

Amalgamation

edit
 
Invergordon station

In the mean time, Parliamentary powers to amalgamate with the Inverness and Aberdeen Junction Railway were sought, and duly obtained on 30 June 1862.[3] The Inverness and Nairn Railway had already amalgamated with the Aberdeen Junction company, on 17 May 1861.[8]

Further north

edit

A further extension, from Invergordon to Bonar Bridge was now planned, and was authorised by the Ross-shire Railway Extension Act of 11 May 1863.[3] The Act gave the powers to the Inverness and Aberdeen Junction Railway.[4] The extension opened to Meikle Ferry on 1 June 1864. The ferry enabled onward road journeys to Dornoch and beyond, although the station was not close to the actual ferry landing stage.[note 2] The line was continued to Bonar Bridge, 57 miles (92 km) from Inverness, on 1 October 1864. The Bonar Bridge station is actually at Ardgay, west of the Kyle of Sutherland and not conveniently situated for the community of Bonar Bridge.[3][4]

Formation of the Highland Railway

edit

The railways based on Inverness were working in partnership. On 1 February 1865 Inverness and Aberdeen Junction Railway, the Inverness and Perth Junction Railway and the Inverness and Ross-shire Railway amalgamated, and on 29 June 1865 a change of name was authorised: the enlarged company was to be called the Highland Railway Company.[8]

Still further north

edit

The notion of a Far North Line was now gathering pace, and the independent Sutherland Railway was authorised in 1865, opening to Golspie in 1868. Further extensions took place, until Wick and Thurso were connected by rail on 28 July 1874.[9][10]

Inverness viaduct collapse

edit

In 1989 the River Ness masonry arch viaduct in Inverness collapsed on 7 February due to turbulent conditions in the river. It was reconstructed in a different form.[11]

The route today

edit

The line is still open, being part of the Far North Line.

Locations

edit
  • Inverness; opened 7 November 1855 for Inverness and Nairn Railway; still open;
  • Rose Street Junction; with former Harbour line from Welsh's Bridge Junction, now upgraded to Rose Street curve;
  • Connection to Muirtown basin (on Caledonian Canal);
  • Clachnaharry; opened 1 April 1868; closed 1 April 1913;
  • Bunchrew; opened 11 June 1862; closed 13 June;
  • Lentran; opened 11 June 1862; closed 13 June;
  • Clunes; opened 20 August 1863; closed 13 June 1960;
  • Beauly; opened 11 June 1862; closed 13 June 1960; reopened 15 April 2002; still open.
  • Muir of Ord; junction for Fortrose branch 1904 – 1960;
  • Conon; opened 11 June 1862; closed 13 June 1960; reopened as Conon Bridge 8 February 2013; still open;
  • Dingwall; opened 11 June 1862; still open;
  • Dingwall North Junction; divergence of Dingwall and Skye Railway to Kyle of Lochalsh, 1870 to present day;
  • Fowlis; opened 23 March 1863; renamed Foulis 20 March 1916; closed 13 June 1960;
  • Novar; opened 23 March 1863; renamed Evanton 1 June 1937; closed 13 June 1960
  • Alness; opened 23 March 1863; closed 13 June 1960; reopened 7 May 1973; still open;
  • Invergordon; short harbour branch 1874 - 1971;
  • Invergordon; opened 23 March 1863; still open;
  • Delney; opened 1 June 1864; renamed Delny 1865; closed 13 June 1960;
  • Parkhill; opened 1 April 1861; renamed Kildary 1 May 1868; closed 13 June 1960;
  • Nigg; opened 1 June 1864; closed 13 June 1960;
  • Fearn; opened 1 June 1864; still open;
  • Tain; opened 1 June 1864; still open;
  • Meikle Ferry; opened 1 June 1864; closed 1 January 1869;
  • Edderton; opened 1 October 1864; closed 13 June 1960;
  • Mid Fearn; opened 1 October 1864; closed 31 March 1865;
  • Bonar Bridge; opened 1 October 1864; renamed Ardgay 2 May 1977.[12]

The onward route northward from Bonar Bridge was opened in 1868 by the Sutherland Railway.

Notes

edit
  1. ^ Ross gives the opening to Invergordon as 23 May 1863 on page 175, but this seems to be a mistake. Quick gives 23 March, but the discrepancy may be due to ceremonial and full public openings.
  2. ^ The Dornoch Firth Bridge was opened in 1991, crossing the Firth at this point.

References

edit
  1. ^ John Thomas and David Turnock, A Regional History of the Railways of Great Britain: volume 15: North of Scotland, David St John Thomas (publisher), Newton Abbot, 1989, ISBN 0946537 03 8, page 154
  2. ^ Thomas and Turnock, page 225
  3. ^ a b c d e f g H E Vallance et al, The Highland Railway, David & Charles, Newton Abbot, 1938, extended edition 1985, ISBN 0-946537--24-0, pages 30 to 33
  4. ^ a b c d Donald J Grant, Directory of the Railway Companies of Great Britain, Matador, Kibworth Beauchamp, 2017, ISBN 978 1785893 537, pages 279 and 280
  5. ^ David Ross, The Highland Railway, Tempus Publishing Limited, Stroud, 2005, ISBN 0 7524 3479 9, page 33
  6. ^ Vallance et al, page 175
  7. ^ a b Ross, page 34
  8. ^ a b Vallance et al, page 28
  9. ^ Vallance et al, pages 35 to 37
  10. ^ Thomas and Turnock, page 317
  11. ^ The Herald (Inverness newspaper), 8 February 1989
  12. ^ M E Quick, Railway Passenger Stations in England, Wales and Scotland: A Chronology, version 5.03, September 2021, Railway and Canal Historical Society, electronic download, alphabetically arranged