File talk:HVDC Europe.svg

Latest comment: 11 years ago by 83.82.146.255

On the map NorNed cable is wrong.. It enters From Feda (Norway) in Eemshaven (The Netherlands, in the Groningen province) and not in Oost Friesland (Germany) like on the map. Who can fix this? — Preceding unsigned comment added by 83.82.146.255 (talk) 04:28, 29 September 2012 (UTC)Reply

This map is out of date. The red line between Germany and Norway supposed to be between The Netherlands and Norway. Moreover, the red line between The Netherlands and Great-Britain is not a supposed link anymore. In fact, the link is almost finished (July 2010). —Preceding unsigned comment added by 194.229.228.50 (talk) 08:21, 28 July 2010 (UTC)Reply

Does the connection from Germany into the North Sea refer to the Borkum 2 connection? The page at http://www.abb.de/cawp/deabb207/9ff10487ee50d83fc125740c00514bd5.aspx\t_self says it is under construction, and will not be in operation until Sept. 2009.

Wingedsubmariner (talk) 16:56, 31 January 2009 (UTC)Reply