File:John Dunn Bridge under construction on 11 November 2022 as viewed from the east side of the river in the RÍo Grande del Norte National Monument.jpg

Original file(6,000 × 4,000 pixels, file size: 9.83 MB, MIME type: image/jpeg)

Summary

Description
English: John Dunn Bridge under construction on 11 November 2022 as viewed from the east side of the Rio Grande.
Date
Source Own work
Author Matthew.kowal

Licensing

I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

Captions

John Dunn Bridge under construction on 11 November 2022 as viewed from the east side of the river in the RÍo Grande del Norte National Monument

29 November 2022

0.008 second

35 millimetre

image/jpeg

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current18:10, 3 December 2022Thumbnail for version as of 18:10, 3 December 20226,000 × 4,000 (9.83 MB)Matthew.kowalUploaded own work with UploadWizard
The following pages on the English Wikipedia use this file (pages on other projects are not listed):

Metadata