File:Aerial view of McCook Reservoir Phase II construction, September 2023.JPG

Original file(5,133 × 3,425 pixels, file size: 7.89 MB, MIME type: image/jpeg)

Summary

Description
English: Aerial view of Phase II of the McCook Reservoir, part of the Tunnel and Reservoir Plan (Chicago Deep Tunnel), under construction in September 2023. Interstate 55 and the Des Plaines River are at bottom right; the Chicago Sanitary and Ship Canal is at top left.
Date Taken on 17 September 2023
Source Own work
Author Pi.1415926535
Object location41° 46′ 24.6″ N, 87° 50′ 22.2″ W Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

I, the copyright holder of this work, hereby publish it under the following licenses:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
GNU head Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.
You may select the license of your choice.

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

17 September 2023

41°46'24.6"N, 87°50'22.2"W

0.0025 second

5.8 millimetre

image/jpeg

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current05:41, 20 September 2023Thumbnail for version as of 05:41, 20 September 20235,133 × 3,425 (7.89 MB)Pi.1415926535== {{int:filedesc}} == {{Information |Description ={{en|1=Aerial view of Phase II of the McCook Reservoir, part of the Tunnel and Reservoir Plan (Chicago Deep Tunnel), under construction in September 2023. Interstate 55 and the Des Plaines River are at bottom right; the Chicago Sanitary and Ship Canal is at top left.}} |Source ={{own}} |Author =Pi.1415926535 |Date ={{taken on|2023-09-17}} |Permission = |other_versions = }} {{Object locat...
The following pages on the English Wikipedia use this file (pages on other projects are not listed):

Metadata